Sources Sought for 155MM Cargo Projectile Load, Assemble, Pack (LAP) Flexible Line Facility Capability

SOL #: W519TC-26-R-0004Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

Richmond, KY

NAICS

Ammunition (except Small Arms) Manufacturing (332993)

PSC

Construction Of Ammunition Facilities (Y1EA)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 15, 2025
2
Last Updated
Feb 20, 2026
3
Response Deadline
Feb 5, 2026, 5:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Army Contracting Command - Rock Island (ACC-RI), on behalf of Project Lead Joint Services (PL JS), Project Manager Combat Ammunition Systems (PM CAS), and Joint Munitions Command (JMC), is conducting a Sources Sought to identify vendors capable of designing, constructing, installing, and qualifying a flexible modernized Load, Assemble, and Pack (LAP) facility for various 155MM cargo projectiles at Blue Grass Army Depot (BGAD) in Richmond, KY. The facility must achieve a production capacity of 30,000 rounds per year, with qualification completed by September 30, 2027. The government intends to award a non-competitive, sole source, undefinitized contract action (UCA) with a Firm Fixed Price (FFP) ceiling. Responses are due by February 5, 2026.

Purpose & Scope

This Sources Sought aims to gather information from foreign and domestic vendors for a new LAP facility at BGAD. The facility will be government-owned and must be capable of loading/filling, assembling, and packing 155MM cargo projectiles, supporting surge requirements, and meeting a 30,000 rounds/year production target. The scope includes the full lifecycle from design through qualification of the manufacturing line.

Contract Details

  • Opportunity Type: Sources Sought (market research for potential sole source award)
  • Intended Award Type: Non-competitive, sole source, undefinitized contract action (UCA) with a Firm Fixed Price (FFP) ceiling, not-to-exceed (NTE) value.
  • Place of Performance: Blue Grass Army Depot, Richmond, KY.
  • Performance Completion: Qualification of the LAP manufacturing line (including x-ray) by September 30, 2027.
  • Set-Aside: None specified (seeking information for potential sole source).

Submission Requirements

  • Responses Due: February 5, 2026.
  • Page Limit: 100 pages.
  • Content: Must include company information, technical expertise, capability details, and a not-to-exceed price for the design, construction, installation, and qualification of the facility.
  • Registration: Vendors must be registered in the System for Award Management (SAM).
  • Access to Documents: Interested vendors need an approved DD Form 2345, Military Critical Technical Data Requirement, on file with the Joint Certification Program (JCP) to access restricted documents (SOW and building floor plans).

Evaluation Factors

Responses will be evaluated based on demonstrated capability, recent experience, proposed technology, schedule feasibility, estimated price, teaming arrangements, and overall viability of the proposed solution.

Industry Day

An Industry Day was held virtually on January 12, 2026, with virtual one-on-one sessions and onsite tours at BGAD from January 12-15, 2026. The purpose was to provide a briefing on project requirements and facilitate communication.

Contact Information

People

Points of Contact

Lindsey ArguelloPRIMARY
Warren StropesSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Sources Sought
Posted: Feb 20, 2026
View
Version 8
Sources Sought
Posted: Feb 20, 2026
View
Version 7
Sources Sought
Posted: Feb 11, 2026
View
Version 6
Sources Sought
Posted: Jan 30, 2026
View
Version 5
Sources Sought
Posted: Jan 23, 2026
View
Version 4Viewing
Sources Sought
Posted: Jan 12, 2026
Version 3
Sources Sought
Posted: Jan 9, 2026
View
Version 2
Sources Sought
Posted: Dec 30, 2025
View
Version 1
Sources Sought
Posted: Dec 15, 2025
View