STEEL TOWER ROAD CULVERT REPAIR

SOL #: N4008526R9032Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) (HZC)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
Apr 28, 2026
3
Submission Deadline
May 28, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the Steel Tower Road Culvert Repair project at MCB Camp Lejeune, North Carolina. This Combined Synopsis/Solicitation involves the removal and replacement of an existing 48-inch culvert and headwalls. The estimated cost range is between $100,000 and $250,000. This opportunity is restricted to specific Civil/Paving MACC contractors. Proposals are due May 28, 2026, at 2:00 PM EST.

Scope of Work

The project's objective is to remove and replace an existing 48-inch culvert and headwalls with new ones on Steel Tower Road within the Verona Loop Training Area. The detailed scope includes:

  • Demolition of approximately 1000 square feet of 18-inch thick concrete roadway.
  • Removal of about 100 linear feet of existing 48-inch corrugated metal pipe and necessary rip-rap.
  • Installation of 96 linear feet of new 48-inch Reinforced Concrete Pipe (RCP) and new concrete headwalls per NCDOT details.
  • Backfilling with stabilized rip-rap, geotextile, and Aggregate Base Course (ABC) compacted to 95% density.
  • Roadway backfill to match existing elevation or provide a minimum of 24 inches of cover over the new RCP.
  • Seeding and permanent vegetative cover for all disturbed areas. The road will be closed during construction, but the facility/activity must remain operational with minimal interference.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation
  • Product Service Code: Z2LB (Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways)
  • Estimated Value: $100,000 - $250,000
  • Contract Completion: 240 days after award.
  • Liquidated Damages: $220 per Calendar Day.
  • Bond Requirements: Bid bonds for proposals $35K+, payment/performance bonds for $150K+.
  • Funding Note: Offerors are advised that funding may not become available; if not, no award will be made, and proposal costs will not be reimbursed.

Submission & Evaluation

  • Eligibility: Only Quadrant Construction, Inc., Riza Construction, Inc., and Civil Works Contracting, LLC. may submit proposals.
  • Proposal Due Date: May 28, 2026, 2:00 PM EST.
  • Submission Method: Via email to brandi.l.porche.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
  • Proposal Acceptance Period: 60 days from receipt of offers.
  • Basis for Award: Lowest Price.
  • Requests for Information (RFIs) Cut-off: May 13, 2026, 2:00 PM EST.
  • Site Visit: Scheduled for Tuesday, May 5, 2026, at 0900. Attendees meet outside Building 1005.
  • Amendments: Offerors must acknowledge receipt of all amendments (e.g., Amendment 0001, 0002) when submitting their proposal.

Special Requirements & Notes

  • Personnel: One person may fill Superintendent, Quality Control Manager, and Safety and Health Officer roles if qualified. The project superintendent must have a minimum of 10 years of construction experience, with at least 5 years as a superintendent on similar projects.
  • Environmental: Contractors must comply with the "Contractor Environmental Guide" for MCB Camp Lejeune, covering EMS, hazardous materials, stormwater, and other regulations.
  • General Requirements: Adherence to all Federal, State, Local, and Base regulations, including safety, fire, traffic, and security. UXO awareness training is required for ground-disturbing activities.
  • Submittals: A detailed Submittal Register outlines required documentation throughout the project lifecycle, including a Schedule of Prices, Accident Prevention Plan, and Quality Control Plan.
  • Materials: Buy American Requirement-Construction Materials provision applies. All materials and equipment must be new.
  • Coordination: Contractor must coordinate all activities with ROICC and Range Control, and call "Blackburn" daily. Traffic control must follow MUTCD.

People

Points of Contact

Brandi PorchePRIMARY
Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View