Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W07V ENDIST MEMPHIS, is soliciting proposals for Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY). This project involves extensive marine and landside construction work. The acquisition is an unrestricted procurement with a HUBZone Price Evaluation Preference, utilizing a Best Value Tradeoff source selection process. Proposals are due April 14, 2026.
Scope of Work
The work consists of furnishing all labor, materials, tools, and equipment for the Stringout Replacement at EEY and incidental related work. The project is divided into a base project and six (6) options. Key tasks include:
- Removal of existing steel ramp, ramp abutment, timber piles, steel pipe piles, and concrete piles.
- Demolition and removal of concrete piles and pile caps from the existing railroad trestle.
- Excavation, dredging, and disposal of materials.
- Installation of Government Furnished Equipment (GFE) steel floats and a new landing barge.
- Providing new steel pipe piles and steel-framed pile clusters, and donut fenders.
- Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air).
- Construction of a new steel connector bridge, an electrical substation (including equipment foundation), and abutment and landside approach to the connector bridge.
- All earthwork activities for the connector bridge and incidental related work.
The base project work must be completed sequentially from Phase 1 to Phase 2 to ensure continued operation of the Ensley Engineer Yard, with Phase 1 preceding Phase 2. Options, if awarded, will be completed in the sequence directed by the Government.
Contract & Timeline
- Type: Solicitation
- Magnitude of Construction: Between $25,000,000 and $100,000,000
- Set-Aside: Unrestricted with HUBZone Price Evaluation Preference
- Response Due: April 14, 2026, 3:00 PM Z
- Published: March 9, 2026, 4:24 PM Z
- Product Service Code: Y1PZ (Construction Of Other Non Building Facilities)
Evaluation
Award will be made using a Best Value Tradeoff source selection process. A HUBZone Price Evaluation Preference will be applied.