TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117

SOL #: FA813726R0030Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Submission Deadline
Jun 26, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals from Tinker AFB MAC BOA Holders ONLY for the renovation of men's and women's restrooms in Building 117 (B117) at Tinker Air Force Base, Oklahoma. This project, identified as WWYK190023, involves a Design-Bid-Build contract for complete demolition and replacement of plumbing fixtures, domestic piping, and sanitary sewer systems.

This opportunity is a Total Small Business Set-Aside (FAR 19.5). A mandatory initial site visit is scheduled for May 14, 2026, at 1:30 PM at B117, and attendance is required for eligibility to propose. Prime Contractors must RSVP within 5 calendar days of the project posting. Proposals are due by June 29, 2026, 02:00 PM local time.

Scope of Work

The project entails a comprehensive renovation of restrooms in Building 117. Key aspects include:

  • Demolition and Replacement: Complete removal and installation of existing plumbing fixtures, domestic piping to iso valves, and sanitary sewer systems.
  • Occupied Facility: The facility will remain occupied during construction, requiring the contractor to provide portable bathrooms and showers.
  • Phased Construction: The men's restroom must be completed before the women's restroom.
  • Key Personnel: Contractor must provide a Project Manager, Quality Control Manager, and Site Safety and Health Officer with specified qualifications.
  • Deliverables: Baseline construction schedule, progress reports, working documents (e.g., reflected ceiling plan, utility plan), and record drawings.
  • Compliance: Adherence to affirmative procurement requirements (EPA, USDA biobased, Energy Star products) and environmental management (lead concerns identified in wall tile glaze).
  • Drawings: Detailed architectural, structural, plumbing, mechanical, fire protection, and electrical drawings are provided for comprehensive understanding of the scope.

Contract Details

  • Type: Firm Fixed Price construction order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Eligibility: Restricted to Tinker AFB MAC BOA Holders ONLY.
  • Period of Performance: Work must begin within 10 calendar days after award and be completed within 625 calendar days.
  • Funding: Obligation is contingent upon the availability of appropriated funds.
  • Wage Determination: Subject to Davis-Bacon Act prevailing wage rates for Oklahoma County (GDN OK20260049).
  • Product Service Code: Z2AZ - Repair Or Alteration Of Other Administrative Facilities And Service Buildings.

Submission & Evaluation

  • Proposal Due: June 29, 2026, 02:00 PM local time. Offers must be valid for 120 calendar days.
  • Submission Requirements: Proposals must include a completed and signed Order Proposal Request (OPR), amendments, a cover letter detailing exceptions, a work plan, price proposal, and a bid bond (minimum 20% of proposal). Electronic submissions must be in specified formats (MS Word, Excel, PowerPoint, MS-Project, or text-searchable PDF) and include "Company Name, Source Selection Information" in the email subject. No zip files or password-protected files are allowed.
  • Mandatory Site Visit: An initial site visit is scheduled for May 14, 2026, at 1:30 PM in B117. Attendance is mandatory for eligibility to propose. MAC BOA Prime Contractors must RSVP within 5 calendar days from the project posting, indicating base access needs and providing an Entry Access List (EAL) if required.
  • Evaluation: Award will be made using Lowest Priced Technically Acceptable (LPTA) Source Selection procedures. Proposals will be rated "Acceptable" or "Unacceptable" based on technical factors (Capability and Management, Schedule and Planning). An "Acceptable" rating in all subfactors is required. Price proposals will be evaluated for reasonableness, balance, and realism. No technical tradeoffs will be made.

Key Contacts

People

Points of Contact

Eric OwensPRIMARY
Stephen PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 6, 2026
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117 | GovScope