Travis AFB MACC BOA

SOL #: FA442725R0016Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4427 60 CONS LGC
TRAVIS AFB, CA, 94535-2632, United States

Place of Performance

Travis AFB, CA

NAICS

Industrial Building Construction (236210)

PSC

Maintenance Of Other Industrial Buildings (Z1EZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2025
2
Last Updated
Mar 10, 2026
3
Submission Deadline
May 9, 2025, 9:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is establishing a Multiple Award Construction Contract (MACC) Basic Ordering Agreement (BOA) for construction requirements at Travis Air Force Base, CA. This Total Small Business Set-Aside opportunity aims to create a pool of qualified contractors for future task orders. Applications for both Pool 1 (Minor Construction) and Pool 2 (Major/Design-Build Construction) are accepted until May 15, 2030.

Opportunity Details

This BOA will establish two distinct contractor pools:

  • Pool 1: Minor Construction – For non-complex construction projects that do not require design services. Individual task orders will have a maximum value of $300,000 and a minimum of $2,000.
  • Pool 2: Major Construction – For more complex requirements, including design-build projects. Individual task orders will range from $300,000 to $3,000,000.

Anticipated projects include HVAC replacements, flooring/painting, sewer/manhole relining, road repairs, and new construction, with magnitudes ranging from under $25,000 to $10,000,000 for Pool 2 projects. The BOA period of performance is from May 12, 2025, to May 11, 2030, with a Firm Fixed-Price arrangement for task orders. There is no guarantee of future work or minimum amount.

Application & Evaluation

Applications are due by May 15, 2030, at 14:30 PST. Interested contractors must submit a single PDF application using Attachment 4 - Application. Key requirements include:

  • Active SAM.gov registration.
  • A cover letter.
  • Three Past Performance Questionnaires (PPQs) detailing multi-disciplinary construction projects completed within the last three years, preferably on military bases.
  • A letter demonstrating bonding capability (aggregate and single bonding amounts).
  • For Pool 2 (Major Construction), submission of SF-330 Architect-Engineer Qualifications (Attachment 7) is mandatory, demonstrating A/E capabilities in Architectural, Electrical, Mechanical, Civil Engineering, and Environmental disciplines.

Evaluation factors, all of equal importance, include compliance review, past performance, bonding capacity, and A/E qualifications. Only small businesses under NAICS 236210 will be considered.

Contact Information

For inquiries, contact Phillip Manwaring at phillip.manwaring@us.af.mil or 707-424-7769. Secondary contact is Christina Johnson at christina.johnson.32@us.af.mil or 707-424-7749.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 20
Solicitation
Posted: Mar 10, 2026
View
Version 19
Solicitation
Posted: Feb 19, 2026
View
Version 18
Solicitation
Posted: Feb 18, 2026
View
Version 17
Solicitation
Posted: Feb 5, 2026
View
Version 16
Solicitation
Posted: Jan 28, 2026
View
Version 15
Solicitation
Posted: Jan 22, 2026
View
Version 14
Solicitation
Posted: Jan 7, 2026
View
Version 13
Solicitation
Posted: Dec 31, 2025
View
Version 12
Solicitation
Posted: Dec 31, 2025
View
Version 11
Solicitation
Posted: Dec 16, 2025
View
Version 10
Solicitation
Posted: Sep 23, 2025
View
Version 9
Solicitation
Posted: Sep 23, 2025
View
Version 8
Solicitation
Posted: Aug 11, 2025
View
Version 7
Solicitation
Posted: Jun 5, 2025
View
Version 6
Solicitation
Posted: May 19, 2025
View
Version 5
Solicitation
Posted: Apr 28, 2025
View
Version 4
Solicitation
Posted: Apr 21, 2025
View
Version 3Viewing
Solicitation
Posted: Apr 21, 2025
Version 2
Solicitation
Posted: Apr 14, 2025
View
Version 1
Solicitation
Posted: Apr 10, 2025
View