Amendment 0001- Combined synopsis/solicitation for Architect-Engineer (A-E) services

SOL #: W912C326RA007Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FORT BUCHANAN (RC)
FORT BUCHANAN, PR, 00934-4572, United States

Place of Performance

Place of performance not available

NAICS

Engineering Services (541330)

PSC

Other Architect And Engineering Services (C219)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 24, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
Apr 30, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, MICC-FORT BUCHANAN (RC), has issued Amendment 0001 to a combined synopsis/solicitation for Architect-Engineer (A-E) services. This opportunity seeks a firm to conduct comprehensive structural and mechanical (HVAC) assessments of a single-story, 12,000 square foot clinic facility in Puerto Rico. The Government intends to award a Firm-Fixed-Price contract under a Total Small Business Set-Aside. Responses are due April 30, 2026, at 1:00 PM.

Scope of Work

The contractor will provide professional engineering services for the Rodriguez Army Health Clinic in Fort Buchanan, Puerto Rico.

  • Base Requirement: A complete non-invasive structural assessment to evaluate the building's structural integrity, identify deficiencies, and provide a report with a prioritized list of recommended repairs and estimated costs. This includes reviewing available construction documents.
  • Optional Requirement: A complete non-invasive mechanical (HVAC) assessment to evaluate the condition and performance of the HVAC system and its components. This involves an engineering analysis based on ACCA Manuals N, S, and D to determine correct sizing and configuration. If exercised, this option requires a separate report with prioritized recommendations and cost estimates. The Government may exercise this option at its discretion after reviewing the Structural Assessment Report.
  • Deliverables: Draft and Final Structural Assessment Reports, Draft and Final Mechanical (HVAC) Assessment Reports, and a Stakeholder Briefing summarizing findings and recommendations.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (FFP)
  • NAICS Code: 541330 – Engineering Services (Size Standard: $12.5 million)
  • PSC Code: C219 – Other Architect And Engineering Services
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Questions Due: April 03, 2026, 5:00 PM Eastern Standard Time
  • Response Due: April 30, 2026, 1:00 PM
  • Published: April 16, 2026

Submission & Evaluation

  • Submission Method: 100% paperless, electronic submission via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.
  • Selection Process: Based on demonstrated competence and qualifications using SF 330 submissions.
  • Evaluation Criteria: Specialized Experience and Technical Competence, Professional Qualifications of Key Personnel, Past Performance, and Capacity to Accomplish the Work.
  • Mandatory Prerequisite: Firms must hold a current, active license to practice engineering in Puerto Rico.
  • Required Documents: SF 330, Parts I and II. Offerors must state their proposal validity period.

Additional Notes

Offerors are responsible for downloading and reviewing all attachments. The government reserves the right to conduct interviews if deemed necessary.

People

Points of Contact

AHEISHA CROOKSPRIMARY
HARVEY ODOMSECONDARY

Files

Files

Download
View
View
View
View

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View