WA FLAP SKAMAN 92135(1), Wind River Road Slide Reconstruction
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for the Wind River Road Slide Reconstruction project (WA FLAP SKAMAN 92135(1)) in Skamania County, Washington. This project, estimated between $5,000,000 and $10,000,000, is a Total Small Business Set-Aside. The work involves extensive road reconstruction, including slide stabilization and infrastructure improvements. Bids are due January 29, 2026.
Scope of Work
The project focuses on reconstructing a 0.3-mile section of Wind River Road. Key deliverables include the construction of soldier pile and mechanically stabilized earth (MSE) retaining walls, guardrail installation and replacement, culvert lining, and asphalt paving. Additional work encompasses soil erosion and sediment control, clearing and grubbing, roadway excavation, aggregate and base courses, and permanent pavement markings. The project will utilize US Customary Units and FP-24 specifications.
Contract & Timeline
- Type: Invitation for Bids (IFB), Firm Fixed-Price
- Estimated Value: $5,000,000 to $10,000,000
- Period of Performance: To be completed by October 30, 2026, with work commencing within 10 calendar days of notice to proceed.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Bid Opening Date: January 29, 2026, at 2:00 PM local time (virtual viewing available).
- Published Date: January 23, 2026
Amendments & Clarifications
Multiple amendments and Q&A documents have been issued. Amendment A002 (January 23, 2026) revises SF 1442, Special Contract Requirements (Subsection 257.06 Design and Construction for soldier pile walls, drainage, and earth pressure analysis), and Plan sheet C.4. Q&A_01-23-2026 (January 23, 2026) clarifies that a 30-day detour and closure of northbound lanes is permitted for pile installation in Phase 1 (to be reflected in Amendment A001's Phase 1A plan sheets). It also specifies FP-24 Section 403 for HMA, confirms no HUBZone preference, details MSE wall reinforcement length, and states the geotechnical report is for informational purposes only. Global stability analysis for the soldier pile wall is required, considering additional landslide loads, as detailed in Amendment A002. The bid opening due date will not be extended.
Submission & Evaluation
Bidders must submit a printed copy of their proposal; electronic bids are not accepted. A bid bond (Standard Form 24) is required. Questions must be submitted five business days before the bid due date. Representations and Certifications must be updated online at SAM.gov.
Additional Notes
Electronic plan sheets are available. Material sources, water sources, and waste areas are the contractor's responsibility to secure, along with all necessary permits. The project is located within the Columbia River Gorge National Scenic Area.