WA FLAP SKAMAN 92135(1), Wind River Road Slide Reconstruction

SOL #: 69056725B000013Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 26, 2025
2
Last Updated
Feb 5, 2026
3
Submission Deadline
Feb 3, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Highway Division, is soliciting bids for the Wind River Road Slide Reconstruction project (WA FLAP SKAMAN 92135(1)) in Skamania County, Washington. This Total Small Business Set-Aside opportunity, estimated between $5,000,000 and $10,000,000, involves extensive road reconstruction and stabilization. Bids are due by February 3, 2026.

Scope of Work

The project entails reconstructing a 0.3-mile section of Wind River Road affected by a slide. Key deliverables include:

  • Construction of Soldier Pile and Mechanically Stabilized Earth (MSE) retaining walls.
  • Guardrail installation and replacement, culvert lining, and paving.
  • Soil erosion and sediment control measures, clearing, grubbing, and roadway excavation.
  • Aggregate and base courses, asphalt concrete pavement, and milling.
  • Lining of a 36-inch pipe culvert, terminal systems for guardrails, and turf establishment.
  • Temporary stream diversion, permanent pavement markings, and temporary traffic control. The work will adhere to US Customary Units and FP-24 specifications.

Contract Details

  • Contract Type: Firm Fixed-Price.
  • Period of Performance: To be completed by October 30, 2026, with work commencing within 10 calendar days after Notice to Proceed.
  • Estimated Value: $5,000,000 to $10,000,000.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5). No HUBZone price preference applies.
  • Amendments: Six amendments (A001-A006) have been issued, modifying various sections including wage schedules, special contract requirements, and plan sheets.

Submission & Evaluation

  • Bid Opening Date: February 3, 2026, at 2:00 PM local time.
  • Submission: Printed copies of bids must be submitted to the address listed on SF 1442; electronic bids are not accepted.
  • Questions Deadline: Five business days before the bid due date.
  • Requirements: A bid bond (Standard Form 24) is required. Representations and Certifications must be submitted or updated online at SAM.gov.
  • Evaluation: Standard evaluation factors apply; specific criteria are not detailed in the primary solicitation document.

Key Clarifications & Updates

Numerous Q&A documents and amendments have provided critical clarifications:

  • Traffic Control: Detour and closure of both northbound lanes are permitted for Phase 1 pile installation, limited to 30 consecutive days. Updated plan sheets (Phase 1A) were added in Amendment A001.
  • HMA Specification: Bidders must follow FP-24 Section 403 for Type 1 Asphalt Concrete.
  • MSE Wall Reinforcement: Reinforcement length must follow Subsection 257.06(b), requiring 100% of the total wall height. Powder coating is required on all galvanized steel surfaces for MSE walls per Amendment A004.
  • Soldier Pile Wall: Seismic design is not required. Shotcrete fascia is not an acceptable substitute for cast-in-place fascia. Wall design must account for drainage, requiring an underdrain with an outlet pipe (clarified in A002). A global stability analysis considering landslide loads is required (A002).
  • Geotechnical Report: The supplemental geotechnical report is for informational purposes only and not a contract requirement.
  • Turf Establishment: Seed application rate is 6 pounds per acre, as per Amendment A003.
  • Stockpile Areas: Amendment A005 added stockpile areas to plans, but Amendment A006 subsequently removed the High Bridge Stockpile Area from SCR 105.04 and Plan sheet #A.5.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 17
Solicitation
Posted: Feb 5, 2026
View
Version 16
Solicitation
Posted: Feb 4, 2026
View
Version 15Viewing
Solicitation
Posted: Jan 29, 2026
Version 14
Solicitation
Posted: Jan 28, 2026
View
Version 13
Solicitation
Posted: Jan 27, 2026
View
Version 12
Solicitation
Posted: Jan 27, 2026
View
Version 11
Solicitation
Posted: Jan 27, 2026
View
Version 10
Solicitation
Posted: Jan 27, 2026
View
Version 9
Solicitation
Posted: Jan 27, 2026
View
Version 8
Solicitation
Posted: Jan 26, 2026
View
Version 7
Solicitation
Posted: Jan 23, 2026
View
Version 6
Solicitation
Posted: Jan 22, 2026
View
Version 5
Solicitation
Posted: Jan 14, 2026
View
Version 4
Solicitation
Posted: Jan 14, 2026
View
Version 3
Solicitation
Posted: Jan 12, 2026
View
Version 2
Solicitation
Posted: Dec 30, 2025
View
Version 1
Pre-Solicitation
Posted: Aug 26, 2025
View
WA FLAP SKAMAN 92135(1), Wind River Road Slide Reconstruction | GovScope