Wind- Tunnel upgrade - Industrial Vacuum System (and Ancillary Pumps)

SOL #: W15QKN26QA048Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-PICA
PICATINNY ARSENAL, NJ, 07806-5000, United States

Place of Performance

Picatinny Arsenal, NJ

NAICS

All Other Industrial Machinery Manufacturing (333248)

PSC

Environmental Chambers And Related Equipment (6636)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Mar 19, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Contracting Command - New Jersey (ACC-NJ) is soliciting proposals for an Industrial Vacuum System (and Ancillary Pumps) to support a wind-tunnel upgrade at Picatinny Arsenal, NJ. This requirement is a 100% Total Small Business Set-Aside under NAICS code 333248. The contract will be a Firm-Fixed-Price (FFP) purchase order. Proposals are due March 19, 2026, by 3:00 PM EST.

Scope of Work

This solicitation (W15QKN-26-Q-A048) requires the purchase and delivery of a complete Industrial Vacuum System. Offerors must propose one of two configurations, with the winning bidder responsible for supplying the vacuum vessel:

  • Configuration A: One steel sphere vessel (2,400 cubic feet), one vacuum pump, one pump exhaust silencer (designed for <70 dB), and one vacuum booster.
  • Configuration B: Two steel cylindrical vessels (totaling 2,400 cubic feet), one vacuum pump, one pump exhaust silencer (designed for <70 dB), and one vacuum booster.

Key technical requirements include:

  • Vessel Specifications: Vessels must be ASME-rated, capable of withstanding pressures between 10 Torr and 350 psi, and handle 100% air at 800 degrees Fahrenheit (without an after-cooler).
  • Performance: The system must achieve an objective evacuation time of 30-45 minutes (maximum 60 minutes) to reach a final pressure of 10 Torr.
  • Ancillary Systems: Exhaust air must be cooled to less than 100 degrees Fahrenheit for outdoor location. Pumps will pull atmospheric air and do not require water cooling.
  • Deliverables: Commercial manuals and a Certificate of Conformance (CoC) for each requirement.
  • Delivery: Within twelve (12) months after award, FOB destination, to the Wind Tunnel Facility, Picatinny Arsenal, NJ 07806-5000.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) purchase order.
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 333248 (All Other Industrial Machinery Manufacturing) with a small business size standard of 750 employees.
  • Period of Performance: Delivery within 12 months after award.

Submission & Evaluation

  • Offer Due Date: March 19, 2026, by 3:00 PM EST.
  • Submission Method: Electronically through the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Direct email submissions will be considered invalid.
  • Evaluation: Proposals will be evaluated on a two-volume basis: Volume I - Technical Quote and Volume II - Price Quote. Technical proposals will be assessed on an acceptable/unacceptable (pass/fail) basis. Award will be made to the responsive and responsible offeror with the lowest evaluated total price among technically acceptable offers. Technical Capability and Price factors are of equal importance.
  • Offerors must complete and submit OMB Standard Form 1449 and Disclosure of Lobbying Activities if applicable.

Points of Contact

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
Wind- Tunnel upgrade - Industrial Vacuum System (and Ancillary Pumps) | GovScope