Wings & Fins Subassemblies

SOL #: FA855626RB013Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8556 AFLCMC EBGK COM
ROBINS AFB, GA, 31098-1811, United States

Place of Performance

Warner Robins, GA

NAICS

Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing (336419)

PSC

Guided Missile Components (1420)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Last Updated
Jun 1, 2026
3
Submission Deadline
Jun 1, 2026, 7:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically AFLCMC EBGK COM, is soliciting proposals for Wing and Fin Sub-Assemblies. These critical sub-components are required to support the AIM-120X and CATM-120X series of the Advanced Medium Range Air-to-Air Missile (AMRAAM). This is a Total Small Business Set-Aside opportunity, with the Government intending to award a single contract. Proposals are due June 1, 2026.

Scope of Work

The procurement covers the manufacturing and delivery of Wing and Fin Sub-Assemblies as detailed in Attachment 2 Statement of Work (SOW). The Government anticipates a First Article timeline of 6-12 months for production, followed by an additional 6-12 months for First Article Testing (FAT). Mass delivery is projected to occur in 2029, contingent upon successful FAT and product validation.

Contract & Timeline

  • Type: Solicitation for a single contract award
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Response Due: June 1, 2026, 7:30 PM ET
  • Published: May 11, 2026
  • Place of Performance: Warner Robins, GA

Evaluation & Award Criteria

Award will be made using Lowest Price, Technically Acceptable (LPTA) source selection procedures, in accordance with FAR 15.103-2 and DoD Source Selection Procedures. The Government will evaluate only one proposal from each offeror. Award will be granted to the responsible offeror whose proposal is technically acceptable, conforms to all solicitation requirements (terms, conditions, representations, certifications, and technical requirements), and presents the lowest Total Evaluated Price.

Technical Evaluation Factors (Equally Important):

  • Wing and Fin Packaging, Handling, Shipping and Transportation Solution
  • Wing and Fin Production Plan
  • Finished/In Process Product Verification Plan
  • Honeycomb Implementation

Key Clarifications & Notes

  • Vendors are expected to absorb Non-Recurring Engineering (NRE) costs and distribute them within the delivered unit pricing. The Government does not possess digital models of the wings and fins.
  • The Government will not provide training or best practices for brazing operations; delivered items must match drawings and specifications (MIL-B-7883 Type II, Class A).
  • Partial bids, specifically for metal part manufacture without honeycomb brazing, are not acceptable. The Government requires the complete sub-assembly.
  • Previously missing drawings (7038187, 7038184, 7038174, 7038173) from Drawing Set 4 have been updated and added to the notice.
  • Drawings from Notice ID FA8556-25-R-B016 have also been incorporated into this notice. For any questions regarding drawings, contact Ivan Jones.

People

Points of Contact

Dillan Harper-SmithPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Solicitation
Posted: Jun 1, 2026
View
Version 8
Solicitation
Posted: May 29, 2026
View
Version 7
Solicitation
Posted: May 14, 2026
View
Version 6
Solicitation
Posted: May 11, 2026
View
Version 5Viewing
Solicitation
Posted: May 11, 2026
Version 4
Solicitation
Posted: May 11, 2026
View
Version 3
Solicitation
Posted: May 7, 2026
View
Version 2
Solicitation
Posted: May 4, 2026
View
Version 1
Solicitation
Posted: Apr 17, 2026
View