B149 Chiller Replacement at Pease ANGB

SOL #: W50S8A26QA010Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NN USPFO ACTIVITY NHANG 157
PORTSMOUTH, NH, 03801-2886, United States

Place of Performance

NH

NAICS

Plumbing (238220)

PSC

Air Conditioning Equipment (4120)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Submission Deadline
Jun 5, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, through the NH Air National Guard, is seeking quotes for the B149 Chiller Replacement at Pease ANGB. This Total Small Business Set-Aside opportunity requires the complete removal of an existing chiller and the installation of a new, fully operational chiller system at Building 149, Pease Air National Guard Base, Newington, NH. The contract will be a Firm-Fixed Price (FFP). Quotes are due by June 5, 2026, at 04:00 PM Eastern Time.

Scope of Work

The project involves the complete removal and disposal of the current air-cooled chiller, buffer tank, and associated piping. The contractor will then furnish and install a new, like-for-like, 25-ton modular air-cooled chiller (comprising 10-ton and 15-ton modules) and a 460-gallon buffer tank. Key requirements include ensuring compatibility with the existing Schneider Electric base-wide control system, providing new electrical infrastructure, installing a 30% glycol solution, replacing and reprogramming HVAC controllers with Bacnet compliant Schneider Electric IP controllers, and updating the central Building Management server graphics. The new system must be fully functional, code-compliant, and undergo a 72-hour commissioning run.

Contract Details & Timeline

  • Solicitation Type: Combined Synopsis/Solicitation (RFQ)
  • Solicitation Number: W50S8A26QA010
  • Contract Type: Firm-Fixed Price (FFP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 238220 Plumbing, Heating, and Air-Conditioning Contractors (Small Business Size Standard: $19,000,000)
  • Place of Performance: Building 149, Pease Air National Guard Base, Newington, NH 03801
  • Period of Performance: Work to be completed within 135 calendar days of contract award.
  • Quotes Due: June 5, 2026, 04:00 PM Eastern Time
  • Questions Due: May 15, 2026, 12:00 PM EST
  • Published Date: May 6, 2026
  • Funding: Award is contingent upon the availability of adequate funds (FAR 52.232-18).
  • Quote Validity: Quotes must be valid for sixty (60) days.

Submission & Evaluation

Interested parties must submit quotes in accordance with the "Instructions to Offers" (FAR 52.212-1) detailed in the Provisions and Clauses document. Evaluation factors will be based on FAR 52.212-2, also outlined in the Provisions and Clauses document. All technical or contractual questions must be submitted in writing via email to Casey Pridham (casey.a.pridham.mil@army.mil) and Matthew Lapointe (matthew.r.lapointe.civ@army.mil). Offerors must be actively registered in SAM.gov at the time of award.

Special Requirements

Contractors must ensure personnel are trained, licensed, and certified, and develop a Quality Control Plan (QCP). Personnel require base identification, vehicle passes, and Antiterrorism Awareness Level I Training. Compliance with COMSEC/IT security regulations is mandatory. An approved work plan, including a project schedule and major components list, is required before work commences. As-built drawings, manuals, warranty information, and O&M orientation for base personnel are also required deliverables.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 6, 2026
B149 Chiller Replacement at Pease ANGB | GovScope