B149 Chiller Replacement at Pease ANGB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, specifically the NH Air National Guard, is soliciting quotes for the B149 Chiller Replacement at Pease ANGB. This opportunity requires the complete removal and disposal of the existing chiller and the installation of a new, fully operational chiller system at Building 149. This is a 100% Total Small Business Set-Aside opportunity. Quotes are due by June 16, 2026, at 4:00 PM EST.
Scope of Work
The contractor will furnish all labor, materials, and equipment to remove the existing chiller and install a new, fully operational 70-ton chiller system (composed of two 20-ton and two 15-ton modules) and a 460-gallon buffer tank. The scope includes planning, demolition, installation, integration, and commissioning. Key tasks involve modifying the concrete pad, installing new electrical wiring and appurtenances, providing a 30% glycol solution, and replacing/integrating all HVAC controllers with Bacnet compliant, Schneider Electric IP controllers. New graphics must be added to the existing Schneider Electric central Building Management server.
Contract & Timeline
- Contract Type: Firm-Fixed Price (FFP) Request for Quote (RFQ)
- Set-Aside: Total Small Business
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors ($19,000,000 size standard)
- Place of Performance: 302 Newmarket Street, Newington, NH 03801 (Pease Air National Guard Base)
- Period of Performance: September 15, 2026, to January 31, 2027
- Quote Due Date: June 16, 2026, 4:00 PM EST (extended by Amendment #7)
- Quote Validity: 90 days (extended by Amendment #7)
- Published Date: June 9, 2026
Evaluation
Quotes will be evaluated based on factors detailed in FAR 52.212-2 and its addendums. To be eligible for award, a quote must be rated 'Acceptable' in all non-price factors. A rating of 'Unacceptable' in any factor will render the entire quote ineligible for award.
Additional Notes
- Site Visit: A site visit was held on May 21, 2026. An attendance roster was posted.
- Questions: Technical or contractual questions were due by May 26, 2026, 12:00 noon EST, via email to Casey Pridham (casey.a.pridham.mil@army.mil) and Matthew Lapointe (matthew.r.lapointe.civ@army.mil). Telephone inquiries are not accepted.
- Funding: Funds are not currently available, and award is contingent upon fund availability.
- Submission: Quotes must be submitted via email. The subject line must include the company's legal name and Solicitation Number W50S8A26QA010.
- SAM Registration: Active registration in SAM.gov is required at the time of award.
- Bonds: Bid, performance, and payment bonds are not required.
- Equipment: Used or refurbished equipment is not acceptable. Integration with Schneider Electric EcoStructure BMS is required.
- Documents: Review the "Provisions & Clauses" attachment for complete terms and conditions, and the "B149 Responses Vol I II MQ POSTING.xlsx" and "RFI Responses 8 JUN 26.pdf" for clarifications and Q&A.
- SOW: The updated Statement of Work (posted June 9, 2026) provides the definitive scope and performance period.