B149 Chiller Replacement at Pease ANGB

SOL #: W50S8A26QA010Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NN USPFO ACTIVITY NHANG 157
PORTSMOUTH, NH, 03801-2886, United States

Place of Performance

NH

NAICS

Plumbing (238220)

PSC

Air Conditioning Equipment (4120)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Last Updated
Jun 11, 2026
3
Submission Deadline
Jun 5, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army / NH Air National Guard is soliciting quotes for the B149 Chiller Replacement project at Pease Air National Guard Base, Newington, NH. This Total Small Business Set-Aside opportunity requires the complete removal and disposal of an existing chiller system and the installation of a new, fully operational 25-ton modular air-cooled chiller system at Building 149. The Government intends to award a Firm-Fixed Price (FFP) contract. Quotes are due by June 5, 2026, at 04:00 PM Eastern Time.

Scope of Work

The project involves furnishing all labor, materials, and equipment for the chiller replacement. Key tasks include:

  • Complete removal and disposal of the existing air-cooled chiller, buffer tank, and associated piping.
  • Installation of a new, like-for-like, 25-ton modular air-cooled chiller (comprising 10-ton and 15-ton modules) and a 460-gallon buffer tank.
  • Ensuring compatibility with the existing Schneider Electric base-wide control system.
  • Installation of new electrical wiring, disconnects, circuit breakers, and other electrical appurtenances.
  • Charging the chilled water loop with a 30% glycol solution.
  • Replacement and reprogramming of all HVAC controllers with Bacnet compliant, Schneider Electric IP controllers.
  • Adding new graphics to the existing Schneider Electric central Building Management server. The work must be completed within 135 calendar days of contract award, with normal project hours from 0600-1530, Monday through Friday.

Contract & Timeline

  • Solicitation Number: W50S8A26QA010 (Request for Quote - RFQ)
  • Contract Type: Firm-Fixed Price (FFP)
  • NAICS Code: 238220 Plumbing, Heating, and Air-Conditioning Contractors (Small Business Size Standard: $19,000,000)
  • Set-Aside: Total Small Business Set-Aside (100%)
  • Place of Performance: Building 149, Pease Air National Guard Base, Newington, NH 03801
  • Quote Due Date: June 5, 2026, 04:00 PM Eastern Time
  • Published Date: May 21, 2026
  • Site Visit: May 21, 2026, at 1:00 PM EST. RSVP by May 19, 2026, 4:00 PM EST.
  • Questions Due: May 26, 2026, 12:00 PM EST.

Evaluation Factors

Award will be based on evaluation criteria detailed in the Provisions and Clauses document (IAW FAR 52.212-2). Amendment #2 clarifies that to be eligible for award, a quote must be rated 'Acceptable' in all non-price factors. A rating of 'Unacceptable' in any non-price factor will render the entire quote ineligible. Bidders must review the updated Provisions and Clauses for full details on evaluation and submission instructions (IAW 52.212-1).

Additional Notes

Funds are not currently available for this requirement, and award is contingent upon fund availability (FAR 52.232-18). Quotes must remain valid for sixty (60) days. All technical or contractual questions must be submitted in writing via email to Casey Pridham (casey.a.pridham.mil@army.mil) and Matthew Lapointe (matthew.r.lapointe.civ@army.mil). Registration with the System for Award Management (SAM) at www.sam.gov is required and must be "ACTIVE" at the time of award.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Jun 11, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Jun 7, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 4, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 21, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 6, 2026
View