B149 Chiller Replacement at Pease ANGB

SOL #: W50S8A26QA010Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NN USPFO ACTIVITY NHANG 157
PORTSMOUTH, NH, 03801-2886, United States

Place of Performance

NH

NAICS

Plumbing (238220)

PSC

Air Conditioning Equipment (4120)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 6, 2026
2
Last Updated
Jun 11, 2026
3
Submission Deadline
Jun 8, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The NH Air National Guard is soliciting quotes for the B149 Chiller Replacement at Pease Air National Guard Base, Newington, NH. This 100% Total Small Business Set-Aside opportunity requires the complete removal of an existing chiller and installation of a new, fully operational system. The solicitation is issued as a Request for Quote (RFQ) under NAICS 238220. Quotes are due by June 8, 2026, at 4:00 PM EST.

Scope of Work

The requirement involves the complete removal and disposal of the existing chiller system at Building 149 and the provision and installation of a new, fully operational chiller system. Key tasks include:

  • Furnishing all labor, materials, and equipment.
  • Removing and disposing of the existing air-cooled chiller, buffer tank, and associated piping.
  • Installing a new, like-for-like, 25-ton modular air-cooled chiller (comprising 10-ton and 15-ton modules) and a 460-gallon buffer tank.
  • Ensuring compatibility with the existing Schneider Electric base-wide control system.
  • Providing new electrical wiring, disconnects, circuit breakers, and other electrical appurtenances.
  • Installing a 30% glycol solution in the chilled water loop.
  • Replacing and reprogramming all HVAC controllers with Bacnet compliant, Schneider Electric IP controllers.
  • Adding new graphics to the existing Schneider Electric central Building Management server. Work must be completed within 135 calendar days of contract award.

Contract Details

  • Solicitation Type: Combined Synopsis/Solicitation, Request for Quote (RFQ)
  • Contract Type: Firm-Fixed Price (FFP)
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors ($19,000,000 size standard)
  • Place of Performance: Building 149, Pease Air National Guard Base, Newington, NH 03801
  • Funding: Award is contingent upon the availability of adequate funds (FAR 52.232-18).
  • Quote Validity: Quotes must be valid for sixty (60) days.

Evaluation Factors

Quotes will be evaluated in accordance with FAR 52.212-2 and its addendums. To be eligible for award, a quote must be rated 'Acceptable' in all non-price factors. A rating of 'Unacceptable' in any factor will render the entire quote ineligible for award. Bidders must review the "Provisions and Clauses" document for detailed evaluation criteria.

Key Dates & Actions

  • Questions Due: May 26, 2026, 12:00 PM EST (extended by Amendment #1)
  • Site Visit: Held on May 21, 2026. An attendance roster was posted (Amendment #3).
  • Quotes Due: June 8, 2026, 4:00 PM EST (extended by Amendment #4)
  • Submission: Follow "Instructions to Offers" (IAW 52.212-1) in the Provisions and Clauses document.
  • SAM Registration: Required to be "ACTIVE" at the time of award.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Jun 11, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Jun 7, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Jun 4, 2026
Version 4
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 6, 2026
View