B149 Chiller Replacement at Pease ANGB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army is seeking quotes for a Firm-Fixed Price (FFP) contract for the B149 Chiller Replacement at Pease Air National Guard Base, NH. This Total Small Business Set-Aside opportunity requires the removal of an existing chiller and the installation of a new, fully operational 70-ton modular air-cooled chiller system. Quotes are due June 16, 2026, at 4:00 PM ET.
Scope of Work
The project involves the complete removal and disposal of the current chiller system at Building 149 and the installation of a new, like-for-like, 70-ton modular air-cooled chiller (comprising two 20-ton and two 15-ton modules) along with a 460-gallon buffer tank. Key tasks include:
- Furnishing all labor, materials, and equipment.
- Modifying the concrete pad as needed.
- Installing new electrical wiring, disconnects, and circuit breakers.
- Providing a 30% glycol solution in the chilled water loop.
- Replacing and integrating 24 HVAC controllers with Bacnet compliant, Schneider Electric IP controllers.
- Adding new graphics to the existing Schneider Electric central Building Management server to ensure full integration and functionality.
Contract Details
- Contract Type: Firm-Fixed Price (FFP)
- Set-Aside: Total Small Business (NAICS 238220, $19M size standard)
- Period of Performance: September 15, 2026, to January 31, 2027.
- Place of Performance: Building 149, Pease Air National Guard Base, Newington, NH 03801.
- Funding: Award is contingent upon the availability of funds.
Submission & Evaluation
- Response Deadline: June 16, 2026, 4:00 PM Eastern Time.
- Quote Validity: Quotes must be valid for 90 days.
- Submission Method: Via email to Casey Pridham (casey.a.pridham.mil@army.mil) and Matthew Lapointe (matthew.r.lapointe.civ@army.mil). A specific subject line format is required.
- Evaluation: Quotes must be rated 'Acceptable' in all non-price factors to be eligible for award. The Government will not provide SF1449, SF18, or a pricing sheet.
- SAM Registration: Active registration in SAM.gov is required for award.
Key Amendments & Clarifications
- A site visit was held on May 21, 2026.
- The chiller unit is confirmed as 70-ton, correcting previous miscalculations.
- New Schneider controllers are required for integration with the Schneider Electric EcoStructure BMS.
- Bid, performance, and payment bonds are not required.