B35 Critical Loop
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Kansas National Guard intends to award a single Firm Fixed-Price contract for the Installation of a critical electrical line to Building 35’s communications room at McConnell AFB, Wichita, Kansas. This project, titled "B35 Critical Loop," ensures continuous power to the communications node during outages. This opportunity is a 100% Small Business Set-Aside. Quotes are due by March 5, 2026, at 0900 CST.
Project Scope
The contractor will provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the installation. Key tasks, as detailed in the revised Statement of Work, include:
- Horizontal Directional Drilling: Approximately 600 linear feet of 4" conduit from C2SG to Building 35.
- Transformer Installation: A 12470V Delta to 120/208 3-phase, 150 amp, 75 KVA transformer at Building 35.
- Utility Vault Installation: A 6x6x6' precast utility vault midway between C2SG and Building 35.
- Electrical Wiring: Pulling Number 2 AWG 15KV wire through conduit, terminating at the new transformer, and connecting to the vacant switch at C2SG.
- Transfer Switch Connection: Wiring from the transformer secondary to a disconnect and then to a transfer switch inside the communications room.
- Coordination: Contractor must coordinate power switch-over with base personnel, providing a minimum of 30 days' notice.
- Compliance: All work must comply with federal, state, local, and industry codes (e.g., NEC, OSHA, Kansas DOT).
Contract Details & Requirements
This is a Firm Fixed-Price contract with a duration of 60 calendar days after the Notice to Proceed, including inspection and punch list. The NAICS Code is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19,000,000. The magnitude of construction is between $100,000 and $250,000. Performance and Payment Bonds are required. Access to Building 35 is restricted and requires escorts.
Key Dates & Submission
- Site Visit: Held on February 12, 2026, at 0900 CST.
- Requests for Information (RFI) Due: February 27, 2026, at 0900 CST. Submit via email to
184WG.MSG.CONTRACTING@us.af.milwith the subject "W50S7X-26-Q-A001 RFI's". - Solicitation Closing Date (Quotes Due): March 5, 2026, at 0900 CST. Electronic quotes must be submitted to
184WG.MSG.CONTRACTING@us.af.milwith the subject "W50S7X-26-Q-A001 Offer; Company name". - Offer Validity: 30 calendar days after the offer due date.
Evaluation & Eligibility
Award will be based on a Best Value determination, considering Price and Experience/Capability, with Price being more important. This is a 100% Total Small Business Set-Aside. Interested offerors must be registered in the System for Award Management (SAM) at www.SAM.gov.
Additional Information
The solicitation and associated information, including proposed critical power circuit routes, are available on SAM.gov. Contractors are strongly cautioned to read all requirements carefully and comply accordingly.