B35 Critical Loop

SOL #: W50S7X26QA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7M9 USPFO ACTIVITY KSANG 184
MCCONNELL AFB, KS, 67221-9000, United States

Place of Performance

PRAIRIE VLG, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electric Wire, And Power And Distribution Equipment (N061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 7, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 15, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Kansas National Guard is soliciting quotes for a Firm Fixed-Price contract for the B35 Critical Loop project at McConnell AFB, Wichita, Kansas. This project involves the installation of a critical electrical line to Building 35's communications room to ensure continuous power during outages. This opportunity is a Total Small Business Set-Aside. Proposals are due March 12, 2026, at 09:00 AM CST.

Scope of Work

The contractor will provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision for the installation of a critical electrical line. Key tasks include:

  • Horizontal Directional Drilling: Approximately 600 linear feet of 4" conduit from C2SG to Building 35, encased in 4000 psi concrete where hydrovac is used or under existing roads/sidewalks.
  • Transformer Installation: Install a new 12470V Delta to 120/208 3-phase, 150 amp, 75 KVA transformer (contractor-provided, new units only) at Building 35, including a 4000 psi reinforced concrete pad.
  • Utility Vault Installation: Install a 6x6x6' precast utility vault midway between C2SG and Building 35.
  • Electrical Wiring: Pull Number 2 AWG 15KV wire through the conduit, terminate at the new transformer, and connect to the vacant switch at C2SG. Pull 4/O wire from the transformer secondary to a disconnect and transfer switch inside the communications room.
  • Coordination: Coordinate power switch-over with base personnel, providing a minimum of 30 days' notice.
  • Compliance: Adhere to federal, state, local, and industry codes (e.g., NEC, OSHA), McConnell AFB HMMP, and confined space procedures.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Duration: 60 calendar days after Notice to Proceed.
  • Magnitude: Between $100,000 and $250,000.
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a $19,000,000 small business size standard.
  • Set-Aside: 100% Total Small Business.
  • Evaluation: Best Value, considering Price and Experience/Capability, with Price being more important.
  • Bonds: Performance and Payment Bonds are required.

Key Dates

  • Site Visit: February 12, 2026, at 09:00 CST (already occurred).
  • Questions Due: February 27, 2026, at 09:00 CST.
  • Proposal Due: March 12, 2026, at 09:00 AM CST.
  • Offer Acceptance Period: Minimum of 30 calendar days.

Submission & Requirements

Electronic quotes must be submitted to 184WG.MSG.CONTRACTING@us.af.mil. Offerors must be registered in the System for Award Management (SAM) at www.SAM.gov. A site inspection is required prior to bid submission.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Mar 9, 2026
View
Version 9
Solicitation
Posted: Mar 4, 2026
View
Version 8
Solicitation
Posted: Feb 26, 2026
View
Version 7
Solicitation
Posted: Feb 26, 2026
View
Version 6Viewing
Solicitation
Posted: Feb 25, 2026
Version 5
Solicitation
Posted: Feb 25, 2026
View
Version 4
Solicitation
Posted: Feb 24, 2026
View
Version 3
Solicitation
Posted: Feb 12, 2026
View
Version 2
Solicitation
Posted: Feb 3, 2026
View
Version 1
Sources Sought
Posted: Jan 7, 2026
View