B35 Critical Loop

SOL #: W50S7X26QA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7M9 USPFO ACTIVITY KSANG 184
MCCONNELL AFB, KS, 67221-9000, United States

Place of Performance

PRAIRIE VLG, KS

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Installation Of Equipment: Electric Wire, And Power And Distribution Equipment (N061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 7, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 15, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Kansas National Guard is soliciting proposals for the B35 Critical Loop project, involving the installation of a critical electrical line to Building 35's communications room at McConnell Air Force Base, Wichita, Kansas. This 100% Total Small Business Set-Aside opportunity aims to ensure continuous power to the communications node during outages. Proposals are due March 12, 2026.

Scope of Work

The project requires the installation of a critical electrical line to Building 35, powered from Building 16's critical loop. Key tasks include:

  • Horizontal Directional Drilling: Approximately 600 linear feet of 4" conduit from C2SG to Building 35. Boring is required under roads/sidewalks; hydrovac trenching with concrete encasing in grassy areas.
  • Transformer Installation: Furnish and install a new 75 KVA, 12470V Delta to 120/208 3-phase, 150 amp transformer at Building 35, with a 4000 psi reinforced concrete pad. The contractor is responsible for providing the transformer.
  • Utility Vault: Install a 6x6x6' precast utility vault midway between C2SG and Building 35.
  • Electrical Wiring: Pull Number 2 AWG 15KV tape shield wire (VLF tested) through conduit, terminating at the new transformer and connecting to a vacant switch at C2SG. Pull 4/O wire from the transformer secondary to a disconnect and transfer switch inside the communications room.
  • Coordination: Contractor must coordinate power switch-over with base personnel, providing 30 days' notice.
  • Compliance: Adherence to federal, state, local, and industry codes (e.g., NEC, OSHA), and McConnell AFB Hazardous Materials Management Program (HMMP) is mandatory.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP)
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237130 (Power and Communication Line and Related Structures Construction)
  • Small Business Size Standard: $45,000,000
  • Magnitude of Construction: Between $100,000 and $250,000
  • Period of Performance: 60 calendar days after Notice to Proceed (NTP), with performance beginning within 10 calendar days of NTP.
  • Bonds: Performance and Payment Bonds are required.

Key Dates & Submission

  • Questions Due: February 27, 2026, at 09:00 CST
  • Proposal Due: March 12, 2026, at 09:00 CST
  • Submission Method: Electronic quotes to 184WG.MSG.CONTRACTING@us.af.mil

Evaluation Criteria

Award will be made to the responsible Small Business Offeror whose offer represents the Best Value to the Government, considering Price and Experience/Capability. Price is considered more important than experience and capability.

Special Requirements

Offerors must be registered in the System for Award Management (SAM). A tax-exempt certificate will be issued for this project. The specific cabling route is to be determined by the contractor.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Mar 9, 2026
View
Version 9
Solicitation
Posted: Mar 4, 2026
View
Version 8Viewing
Solicitation
Posted: Feb 26, 2026
Version 7
Solicitation
Posted: Feb 26, 2026
View
Version 6
Solicitation
Posted: Feb 25, 2026
View
Version 5
Solicitation
Posted: Feb 25, 2026
View
Version 4
Solicitation
Posted: Feb 24, 2026
View
Version 3
Solicitation
Posted: Feb 12, 2026
View
Version 2
Solicitation
Posted: Feb 3, 2026
View
Version 1
Sources Sought
Posted: Jan 7, 2026
View