B35 Critical Loop

SOL #: W50S7X26QA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7M9 USPFO ACTIVITY KSANG 184
MCCONNELL AFB, KS, 67221-9000, United States

Place of Performance

PRAIRIE VLG, KS

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Installation Of Equipment: Electric Wire, And Power And Distribution Equipment (N061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 7, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 15, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Kansas National Guard is soliciting proposals for the B35 Critical Loop project, involving the installation of a critical electrical line to Building 35's communications room at McConnell AFB, Wichita, Kansas. This project is a 100% Total Small Business Set-Aside with an estimated magnitude between $100,000 and $250,000. The contract duration is 60 calendar days after notice to proceed. Proposals are due by March 15, 2026, at 09:00 AM CST.

Scope of Work

The project requires the installation of a critical electrical line to ensure continuous power to Building 35's communications room, fed from Building 16's critical loop. Key tasks include:

  • Horizontal directional drilling for approximately 600 linear feet of 4" conduit.
  • Installation of a 75 KVA transformer and a 6x6x6' precast utility vault.
  • Pulling and terminating Number 2 AWG 15KV wire and connecting a transfer switch.
  • Coordination with base personnel for power switch-over, requiring 30 days' notice.
  • Compliance with all federal, state, local, and industry codes (e.g., NEC, OSHA) and McConnell AFB regulations.

Key Clarifications & Requirements

Recent amendments and RFI responses have clarified several points:

  • The NAICS code has been updated to 237130 (Power and Communication Line and Related Structures Construction).
  • New Medium Voltage (MV) transformers are required; refurbished units are not acceptable, and the contractor must provide the transformer.
  • Conduit encasing in 4000 psi concrete is required in open trenching areas and where hydrovac is used in grassy areas; boring under roads/sidewalks/pads does not require encasing.
  • The 15KV cable must be tape shield and will require VLF testing.
  • A 4000 psi reinforced concrete pad, minimum 4 inches thick, with 95% compacted soil, is required for the transformer.
  • A tax-exempt certificate will be issued for this project.
  • Contractor is responsible for determining the specific cabling route, with redlines required for future reference.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP)
  • Set-Aside: 100% Total Small Business
  • NAICS Code: 237130 (Small Business Size Standard: $45,000,000)
  • Product Service Code: N061 (Installation Of Equipment: Electric Wire, And Power And Distribution Equipment)
  • Period of Performance: 60 calendar days after Notice to Proceed.
  • Bonds: Performance and Payment Bonds are required.

Submission & Evaluation

  • Proposal Due Date: March 15, 2026, at 09:00 AM CST.
  • Submission Method: Electronic quotes to 184WG.MSG.CONTRACTING@us.af.mil.
  • Evaluation Criteria: Best Value determination, with Price being more important than Experience/Capability.
  • Requirements: Offerors must be registered in the System for Award Management (SAM).

Point of Contact

For inquiries, contact Kevin Smith or Joshua Kingori at 184WG.MSG.CONTRACTING@us.af.mil.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10Viewing
Solicitation
Posted: Mar 9, 2026
Version 9
Solicitation
Posted: Mar 4, 2026
View
Version 8
Solicitation
Posted: Feb 26, 2026
View
Version 7
Solicitation
Posted: Feb 26, 2026
View
Version 6
Solicitation
Posted: Feb 25, 2026
View
Version 5
Solicitation
Posted: Feb 25, 2026
View
Version 4
Solicitation
Posted: Feb 24, 2026
View
Version 3
Solicitation
Posted: Feb 12, 2026
View
Version 2
Solicitation
Posted: Feb 3, 2026
View
Version 1
Sources Sought
Posted: Jan 7, 2026
View
B35 Critical Loop | GovScope