FCI Oxford Install Water Softener
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Oxford, is soliciting proposals for the installation of a new centralized water softener system at its facility in Oxford, Wisconsin. This is a Firm Fixed-Price contract, set aside 100% for Women-Owned Small Businesses (WOSB) / Economically Disadvantaged Women-Owned Small Businesses (EDWOSB). Proposals will be evaluated using a Lowest Price Technically Acceptable (LPTA) approach. Offers are due by April 2, 2026, at 4:00 PM ET.
Scope of Work
The selected contractor will be responsible for providing all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized commercial-grade water softener system for the entire institution. Key requirements include:
- Removal and disposal of existing water softeners and replacement of piping.
- Installation of a new system with specific components: three 48"x72" fiberglass tanks, 120 cu ft of high-capacity cation resin, Fleck 3900 control valves with NXT 2 Controls, and 3" Clack stainless steel flow meters.
- The system must be set up as a progressive flow system and sized to meet the facility's domestic water demand and hardness removal requirements.
- Adherence to all Federal, National, and local guidelines, codes, and regulations, including seismic zone requirements, environmental compliance, Life Safety, NFPA, and ADA-ABA.
- The new system must not affect the wastewater treatment plant.
- Post-installation, twelve monthly on-site water quality tests by a qualified technician are required.
Contract Details
- Contract Type: Firm Fixed Price
- Estimated Value: Between $250,000.00 and $500,000.00
- Set-Aside: 100% Women-Owned Small Business (WOSB) / Economically Disadvantaged Women-Owned Small Business (EDWOSB)
- Place of Performance: FCI Oxford, 350 Elk Avenue, Oxford, WI 53952
Submission & Evaluation
Offerors must submit three distinct items via email to rcalandra@bop.gov by April 2, 2026, at 4:00 PM ET:
- Completed SF1449 (solicitation form), including Page 1 (block 17a with Name, Email, UEI, Phone) and blocks 30a, 30b, 30c (with the amount), and Page 4.
- Completed SF24 Bid Bond (scanned with visible seal).
- A summary of the technical process for completing the work, in accordance with the Statement of Work. Failure to submit any of these items will result in an unresponsive offer. Evaluation will be based on the Lowest Price Technically Acceptable (LPTA) source selection process.
Pre-Bid Site Visit
A pre-bid site visit is scheduled for March 18, 2026, at 9:00 AM, meeting at the Front Lobby of FCI Oxford, County Road G & Elk Avenue, Oxford, WI 53952. Multiple representatives may attend, and no NCIC clearances are required for the visit. For site visit information, email oxf-facilities-s@bop.gov.
Key Attachments
The solicitation includes a detailed Statement of Work (SOW), Wage Determination (WI20260015) outlining prevailing wage rates for Wisconsin, and the SF24 Bid Bond form.
Contact Information
For questions, contact Ronald Calandra at 843-3287-9424 or rcalandra@bop.gov.