Helena National Forest - Park Lake Dam Rehabilitation

SOL #: 1240LU26Q0013Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Clancy, MT

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 16, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for the Park Lake Dam Rehabilitation project on the Helena Ranger District of the Helena-Lewis and Clark National Forest in Clancy, MT. This Total Small Business Set-Aside opportunity involves comprehensive dam reconstruction and associated civil engineering work. The magnitude of construction is estimated between $1,000,000 and $5,000,000. Quotes are due by February 16, 2026.

Scope of Work

The project entails the full rehabilitation of the Park Lake Dam. Key tasks include:

  • Clearing and grubbing
  • Dewatering of Park Lake
  • Deconstruction of the existing dam
  • Construction of a new dam with a seismic foundation
  • Installation of hydraulic seepage control
  • Road reconstruction and reclamation
  • Associated civil engineering work as detailed in the Forest Service Supplemental Specifications (FSSS) and Drawings. The contractor will be responsible for all labor, materials, tools, equipment, scheduling, and sequencing required to complete the work over two field seasons.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237990 (Other Heavy & Civil Engineering Construction) with a $45 million size standard.
  • Magnitude: Between $1,000,000 and $5,000,000.
  • Contract Type: Anticipated Firm Fixed-Price.
  • Period of Performance: Work to commence within 10 days of Notice to Proceed, with dewatering starting after July 15 of the first construction year. All work must be completed by October 31, 2027. Construction is expected during the 2026 and 2027 calendar years.
  • Place of Performance: Park Lake Dam, Helena Ranger District, Jefferson County, MT (approximately 13 miles west of Clancy, MT).

Submission & Evaluation

  • Quote Due Date: February 16, 2026, by 23:00:00Z.
  • Submission Method: Email quotes to lisa.rakich@usda.gov.
  • Required Documents: Price Schedule (Attachment 2), Past Performance/Experience Questionnaire (Attachment 7), Written Technical Approach, and a Bid Guarantee (20% of total quote).
  • Evaluation Criteria: Award will be made to the offeror representing the best value to the Government, based on a comparative evaluation of Relevant Experience, Past Performance, and Price.
  • Offer Acceptance: Offerors must hold prices firm for 90 calendar days.

Key Attachments & Notes

  • Attachment 1 (Solicitation Terms & Conditions): Outlines overall requirements.
  • Attachment 2 (Schedule of Items): Provides detailed quantities and units for pricing.
  • Attachment 3 (Statement of Work): Defines project objectives and scope.
  • Attachment 4 (FSSS Specifications): Contains critical supplemental technical requirements.
  • Attachment 6 (Davis Bacon Wage Determination): Specifies prevailing wage rates for labor cost estimation.
  • Attachment 7 (Past Performance Questionnaire): Essential for evaluating bidder capability.
  • Site Visit: No pre-bid tour is scheduled; bidders are responsible for visiting the site. A special notice regarding site visits was posted on SAM.gov on 9/24/2025.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jan 30, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jan 15, 2026