Helena National Forest - Park Lake Dam Rehabilitation

SOL #: 1240LU26Q0013Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Clancy, MT

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 19, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for the Park Lake Dam Rehabilitation project on the Helena-Lewis and Clark National Forest in Clancy, MT. This is a Total Small Business Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. The project involves comprehensive dam rehabilitation over two field seasons.

Quotes are due Thursday, February 19, 2026, at 4:00 PM MST.

Project Scope

The rehabilitation of Park Lake Dam includes, but is not limited to:

  • Clearing and grubbing
  • Dewatering of Park Lake (after July 15 of the first year)
  • Deconstruction of the existing dam
  • Construction of a new dam and seismic foundation
  • Hydraulic seepage control
  • Road reconstruction and reclamation

The contractor is responsible for all labor, materials, tools, equipment, scheduling, and sequencing. The full scope is detailed in the Forest Service Supplemental Specifications (FSSS) and Drawings.

Contract Details

  • Contract Type: Request for Quotation (RFQ) for commercial items, anticipated Firm Fixed-Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 237990 Other Heavy & Civil Engineering Construction (Size Standard: $45 million).
  • Period of Performance: May 1, 2026, to October 31, 2027, with work expected in the 2026 and 2027 calendar years.
  • Place of Performance: Park Lake Dam, Helena Ranger District, Jefferson County, MT.

Submission Requirements

Quotes must be submitted via email to lisa.rakich@usda.gov and include:

  • Price Schedule (Attachment 2)
  • Past Performance/Experience Questionnaire (Attachment 7)
  • Written Technical Approach
  • Bid Bond/Offer Guarantee: 20% of your total quote is required.

Evaluation Criteria

Award will be made to the offeror representing the best value to the Government, based on a comparative evaluation of Relevant Experience, Past Performance, and Price.

Key Amendments & Attachments

  • Amendment 0003 (Jan 27, 2026): Added Attachment 9, the Emergency Action Plan (EAP). Confirmed closing date. Clarified Q&A expected Jan 30th.
  • Amendment 0002 (Jan 26, 2026): Changed the closing date for quotes to February 19, 2026, at 4:00 PM MST due to a federal holiday.
  • Amendment 0001 (Jan 23, 2026): Added Attachment 8, Appendix A & B (Geotechnical Data, Obliteration Details).
  • Attachment 4 (FSSS Specifications): Details specific technical requirements and modifications to standard specifications.
  • Attachment 6 (Davis Bacon Wage Determination): Specifies prevailing wage rates for construction classifications in Montana counties.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jan 30, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 15, 2026
View
Helena National Forest - Park Lake Dam Rehabilitation | GovScope