Helena National Forest - Park Lake Dam Rehabilitation

SOL #: 1240LU26Q0013Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Clancy, MT

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 19, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations for the Park Lake Dam Rehabilitation project on the Helena Ranger District of the Helena-Lewis and Clark National Forest in Clancy, MT. This Total Small Business Set-Aside opportunity involves comprehensive dam deconstruction and reconstruction, including a new seismic foundation and hydraulic seepage control. The magnitude of construction is estimated between $1,000,000 and $5,000,000. Quotations are due by Thursday, February 19, 2026, at 4:00 PM MST.

Scope of Work

This project entails the full rehabilitation of the Park Lake Dam. Key tasks include:

  • Clearing and grubbing
  • Dewatering of Park Lake
  • Deconstruction of the existing dam
  • Construction of a new dam with a new seismic foundation
  • Installation of hydraulic seepage control
  • Road reconstruction and reclamation The contractor will be responsible for all labor, materials, tools, equipment, scheduling, and sequencing necessary to complete the work over two field seasons. The full scope is detailed in the Forest Service Supplemental Specifications (FSSS) and Drawings.

Key Documents & Information

  • Attachment 4_FSSS Specifications: Provides detailed technical requirements and modifications to standard specifications.
  • Attachment 8_Appendix A - B: Contains critical geotechnical data (soil strata, lab results) and temporary haul road obliteration details, added by Amendment 0001.
  • Attachment 6_DavisBaconWageDetermination: Specifies prevailing wage rates and fringe benefits for various construction classifications in Montana counties, essential for labor cost estimation.
  • Attachment 2_ScheduleOfItems: Details quantities and units for various tasks, crucial for pricing proposals.
  • Site Visit: No pre-bid tour is scheduled; prospective bidders are responsible for visiting the site. Road accessibility may vary with snowfall.
  • Questions and Answers: Q&A (Q1-Q25) have been posted in the Attachment Section, as noted in Amendment 0002.

Contract Details

  • Type: Request for Quotation (RFQ) / Combined Synopsis/Solicitation, anticipated Firm Fixed-Price.
  • Magnitude: Between $1,000,000 and $5,000,000.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237990 (Other Heavy & Civil Engineering Construction) with a $45 million size standard.
  • Period of Performance: Work is expected to occur over two field seasons, from May 1, 2026, to October 31, 2027. Dewatering cannot begin before July 15 of the first year.
  • Bid Bond: A 20% bid bond/offer guarantee is required with quote submission.

Submission Requirements & Evaluation

  • Submission Method: Via email to lisa.rakich@usda.gov.
  • Required Documents: Quote must include Price Schedule (Attachment 2), Past Performance/Experience Questionnaire (Attachment 7), Written Technical Approach, and a Bid Guarantee.
  • Evaluation Criteria: Award will be made to the offeror representing the best value to the Government, based on a comparative evaluation of Relevant Experience, Past Performance, and Price.
  • Offer Acceptance Period: Offerors must hold prices firm for 90 calendar days.

Important Dates

  • Original Solicitation Issued: January 15, 2026
  • Amendment 0001 Posted: January 23, 2026
  • Amendment 0002 Posted: January 26, 2026
  • Quotations Due: Thursday, February 19, 2026, at 4:00 PM MST.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jan 30, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 15, 2026
View