Helena National Forest - Park Lake Dam Rehabilitation

SOL #: 1240LU26Q0013Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Clancy, MT

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 16, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service has issued a Combined Synopsis/Solicitation (RFQ) for the Park Lake Dam Rehabilitation project on the Helena Ranger District of the Helena-Lewis and Clark National Forest in Clancy, MT. This project, valued between $1,000,000 and $5,000,000, is a Total Small Business Set-Aside. Quotes are due by February 16, 2026, at 4:00 PM MST.

Scope of Work

The project involves comprehensive rehabilitation of the Park Lake Dam over two field seasons (May 1, 2026, to October 31, 2027). Key tasks include:

  • Clearing and Grubbing
  • Dewatering of Park Lake (to commence after July 15 of the first year)
  • Deconstruction of the existing dam
  • Construction of a new dam, including a new seismic foundation and hydraulic seepage control
  • Road reconstruction and reclamation The contractor is responsible for all labor, materials, tools, equipment, scheduling, and sequencing. Detailed technical requirements are provided in the Forest Service Supplemental Specifications (FSSS) and drawings.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237990 (Other Heavy & Civil Engineering Construction)
  • Small Business Size Standard: $45 million
  • Magnitude of Construction: $1,000,000 to $5,000,000
  • Period of Performance: May 1, 2026, to October 31, 2027
  • Place of Performance: Park Lake Dam, Helena Ranger District, Jefferson County, MT

Submission & Evaluation

  • Response Due: February 16, 2026, at 4:00 PM MST
  • Submission Method: Email to lisa.rakich@usda.gov
  • Required Documents:
    • Price Schedule (Attachment 2)
    • Past Performance/Experience Questionnaire (Attachment 7)
    • Written Technical Approach
    • Bid Guarantee: 20% of total quote/offer is required.
  • Evaluation Criteria: Award will be made to the offeror representing the best value to the Government, based on a comparative evaluation of Relevant Experience, Past Performance, and Price.
  • Offer Acceptance Period: 90 calendar days from quote receipt.

Key Attachments & Notes

Amendment 0001 added Attachment 8_Appendix A & B, which includes critical geotechnical data (boring logs, lab test results) and obliteration details. Bidders must review these supplemental specifications and the Statement of Work (Attachment 3) for detailed requirements. A site visit is recommended, as no pre-bid tour is scheduled. Prevailing wage rates (Davis Bacon Wage Determination, Attachment 6) apply.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jan 30, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 15, 2026
View