ID FS NEZPR117 221(1), National Forest Service System Road 221 Rehabilitation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), under the Department of Transportation, has issued a Task Order Request for Proposals (TORP) for the National Forest Service System Road 221 Rehabilitation project in Idaho County, ID. This opportunity is exclusively for pre-selected Idaho, Montana, and Surrounding Areas MATOC IDIQ Holders. Proposals are due by March 10, 2026.
Scope of Work
This project involves the rehabilitation of approximately 27.55 miles of National Forest System Road 221 within the Nez Perce-Clearwater National Forest. Key work includes:
- Pavement preservation, repair, and full-depth reclamation with cement (8-inch and 12-inch).
- Subexcavation and drainage improvements, including culvert installation and replacement (18, 24, 36, 48-inch pipes).
- Slope reinforcement, retaining walls (riprap, rockery, reinforced soil slopes).
- Asphalt concrete pavement, chip seal, micro surfacing, and crack sealing.
- Erosion and sediment control measures (fiber rolls, stabilized construction exits).
- Temporary and permanent traffic control, signage, and pavement markings. The project utilizes "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24."
Contract & Timeline
- Contract Type: Firm Fixed-Price Task Order Contract under an existing MATOC IDIQ.
- Estimated Price Range: $10,000,000 to $20,000,000.
- Period of Performance: Commencement within 10 calendar days after notice to proceed (anticipated by May 15, 2026), with a fixed completion date of October 30, 2026.
- Proposal Due Date: March 10, 2026, by 1400 local time.
- Published Date: January 27, 2026.
Eligibility & Set-Aside
This solicitation is solely for the pre-qualified Idaho, Montana, and Surrounding Areas MATOC IDIQ Holders. Proposals will only be accepted from the listed prime contractors. Large businesses among these holders are required to submit an acceptable subcontracting plan prior to contract award. This notice is also published on SAM.gov to assist potential subcontractors by publicizing opportunities.
Evaluation
Selection of the successful offeror will be based on lowest price.
Submission
Proposals must be submitted as printed copies to the address listed on the SF 1442; electronic proposals will NOT be accepted. General and technical questions are due five (5) days before the proposal due date.
Additional Notes
Detailed plans, geotechnical reports (including material sourcing from Twin Cabins Quarry), and a Stormwater Pollution Prevention Plan (SWPPP) are available as attachments. Bidders should review these documents for comprehensive project requirements and site conditions.