ID FS NEZPR117 221(1), National Forest Service System Road 221 Rehabilitation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Highway Division, is soliciting proposals for the National Forest System Road 221 Rehabilitation project in Idaho County, ID. This is a Task Order Request for Proposals (TORP) issued under the existing Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC) IDIQ. Proposals are due March 17, 2026.
Scope of Work
The project involves the rehabilitation of approximately 27.55 to 29.7 miles of National Forest System Road 221 within the Nez Perce-Clearwater National Forest. Key tasks include:
- Pavement preservation, repair, and subexcavation.
- Full-depth reclamation with cement (8-inch and 12-inch).
- Chip seal and micro surfacing (Type 3).
- Asphalt concrete pavement (1,400 tons) for deep patches, transitions, and culvert replacements.
- Replacement of approximately 17 culverts.
- Shoulder repair, including slumps and minor slides.
- Installation of a Reinforced Soil Slope (RSS) wall.
- Erosion and sediment control measures (SWPPP).
- Temporary and permanent traffic control, and signage. The project utilizes the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24."
Contract Details
- Contract Type: Firm Fixed-Price Task Order Contract.
- Estimated Price Range: $10,000,000 to $20,000,000.
- Period of Performance: Anticipated start by May 15, 2026, with a fixed completion date of October 30, 2026.
- Location: 1.4 Miles North of Grangeville, ID, along USFR 221 from MP 6.8 to MP 34.3.
- Material Sourcing: Geotechnical reports are available for Twin Cabins Quarry as a potential material source.
Eligibility & Submission
- Eligibility: This TORP is exclusively for the six listed prime contractors holding the Idaho, Montana, and Surrounding Areas MATOC IDIQ. It is advertised on SAM.gov to assist potential subcontractors.
- Submission: Printed copies of proposals are required; electronic proposals will NOT be accepted. Offerors must submit revised pages A-7 through A-11 with their offers, reflecting changes from Amendments A001 and A002.
- Proposal Due Date: March 17, 2026, by 21:00:00Z (5 PM MT).
Evaluation
Selection of the successful offeror will be based on lowest price.
Amendments & Clarifications
- Amendment A001 extended the proposal due date to March 13, 2026, and updated micro-surfacing from Type 2 to Type 3.
- Amendment A002 further extended the proposal due date to March 17, 2026, and revised the Asphalt Concrete Pavement quantity (Item A0440) from 6,100 tons to 1,400 tons.
- Q&A documents provide clarifications on control points, micro-surfacing equipment, aggregate screening, and disposal.