ID FS NEZPR117 221(1), National Forest Service System Road 221 Rehabilitation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Highway Division, is soliciting proposals for the National Forest Service System Road 221 Rehabilitation project (ID FS NEZPR117 221(1)). This is a Task Order Request for Proposals (TORP) issued under an existing Multiple Award Task Order Contract (MATOC) for Idaho, Montana, and surrounding areas. The project, located in the Nez Perce-Clearwater National Forest near Grangeville, Idaho, has an estimated value between $10 million and $20 million. Proposals are due March 17, 2026.
Scope of Work
This project involves the rehabilitation of approximately 27.55 miles of National Forest System Road 221. Key work includes:
- Pavement preservation and reclamation, including chip seal and micro surfacing (Type 3).
- Subexcavation and drainage improvements, such as culvert replacements.
- Shoulder repair and installation of Reinforced Soil Slopes (RSS).
- Associated earthwork, temporary and permanent traffic control, and soil erosion and sediment control measures. The project will utilize the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24." Geotechnical reports and control point data are available for bidder review.
Contract & Timeline
- Contract Type: Firm Fixed-Price Task Order.
- Estimated Value: $10,000,000 to $20,000,000.
- Period of Performance: Anticipated start by May 15, 2026, with a fixed completion date of October 30, 2026.
- Eligibility: This TORP is ONLY for the six pre-selected prime contractors holding IDIQ contracts under the Idaho, Montana, and Surrounding Areas MATOC. The opportunity is posted on SAM.gov to assist potential subcontractors. Large businesses must submit an acceptable subcontracting plan.
- Response Due: March 17, 2026, 5:00 PM PT / 8:00 PM ET.
- Submission: Printed copies of proposals are required; electronic submissions will NOT be accepted.
Evaluation
Selection of the successful offeror will be based on the lowest price.
Amendments & Notes
Multiple amendments and Q&A documents have been issued. Amendment A002 extended the proposal due date to March 17, 2026, and revised the quantity for Asphalt Concrete Pavement (Item A0440) from 6,100 tons to 1,400 tons. Amendment A001 updated the micro surfacing requirement from Type 2 to Type 3 and revised Section 409 of the Special Contract Requirements. Offerors must submit revised bid schedule pages (A-7 through A-11) with their proposals.