ID FS NEZPR117 221(1), National Forest Service System Road 221 Rehabilitation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Highway Division, is soliciting proposals for the National Forest System Road 221 Rehabilitation project (ID FS NEZPR117 221(1)). This Firm Fixed-Price Task Order contract, valued between $10 million and $20 million, is exclusively for pre-selected Idaho, Montana, and Surrounding Areas MATOC IDIQ Holders. The project involves extensive road rehabilitation in Idaho County, Idaho, near Grangeville. Proposals are due March 13, 2026.
Scope of Work
This project focuses on the rehabilitation of approximately 27.55 miles of National Forest System Road 221 within the Nez Perce-Clearwater National Forest. Key tasks include:
- Pavement Rehabilitation: Full depth reclamation with cement (8-inch and 12-inch), chip seal, and micro surfacing (Type 3, as updated by Amendment A001).
- Drainage & Earthwork: Replacement of approximately 17 culverts (24, 36, 96-inch pipes), subexcavation, shoulder repair (including slumps and minor slides), and installation of Reinforced Soil Slope (RSS) walls.
- Ancillary Construction: Aggregate and base courses, asphalt concrete pavement and patching, permanent pavement markings, temporary traffic control, and new signage.
- Environmental Compliance: Adherence to a Stormwater Pollution Prevention Plan (SWPPP) and National Core Best Management Practices (BMPs) for water quality. The work will utilize the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24."
Contract & Timeline
- Contract Type: Firm Fixed-Price Task Order Contract
- Estimated Value: $10,000,000 to $20,000,000
- Period of Performance: Anticipated start May 15, 2026, with a fixed completion date of October 30, 2026.
- Proposal Due Date: March 13, 2026, by 1400 local time (extended by Amendment A001).
- Published Date: March 6, 2026.
Eligibility & Evaluation
This Task Order Request for Proposals (TORP) is solely for the six listed prime contractors holding IDIQ contracts under the Idaho, Montana, and Surrounding Areas MATOC. Proposals will be evaluated based on lowest price. Large businesses are required to submit an acceptable subcontracting plan.
Key Amendments & Notes
Amendment A001 (March 6, 2026) extended the proposal due date and updated the bid schedule to specify 'Micro Surfacing, Type 3'. Offerors must acknowledge this amendment and submit revised bid schedule pages. The project is advertised on SAM.gov to assist potential subcontractors by publicizing opportunities. Technical questions should be directed to wfl.plans-spec@dot.gov, and general questions to wfl.contracts@dot.gov.