LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, St. Louis District, is soliciting proposals for Lock Foundation and Site Preparation at Lock and Dam 25 in Winfield, MO. This critical infrastructure project is part of the Navigation Ecosystem Sustainability Program (NESP). The contract will be awarded on a Firm Fixed-Price basis under Full and Open Competition. Proposals are due April 24, 2026.
Scope of Work
The project requires furnishing all equipment, labor, and materials for comprehensive lock foundation and site preparation. Key tasks include:
- Lock Foundation: Excavation and disposal of existing scour protection riprap, dredging and placement of sand fill, placement of a riprap berm, and construction of a sheet pile separator wall braced with piles. This also involves a deflector on the downstream side of the dam to route water.
- Site Preparation: Placement of additional dredge borrow upland for a future staging and laydown area, and installation of a sanitary outfall pipe.
Contract Details
- Contract Type: Firm Fixed-Price Construction.
- Estimated Magnitude: $54,000,000.
- Period of Performance: 365 calendar days for Site Preparation and 548 calendar days for Lock Foundation, both from Notice to Proceed (NTP).
- NAICS Code: 237990 (Other Heavy and Civil Engineering Construction - Dredging Activities).
- Size Standard: $45,000,000.
- Set-Aside: Full and Open Competition.
- Mandatory Requirement: A compliant Project Labor Agreement (PLA) must be submitted with the proposal.
Submission & Evaluation
- Proposal Due Date: April 24, 2026, at 4:00 PM CST.
- Submission Method: Electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.
- Evaluation Basis: Subjective Best Value Trade-Off.
- Evaluation Factors: Proposals will be assessed on Construction Approach, Past Performance, Small Business Participation, and Price. Construction Approach and Past Performance are equally important and more important than Small Business Participation. These three non-cost factors combined are equally important as Price.
- Small Business Participation: Offerors are expected to commit to a target of 25% small business subcontracting.
- Inquiries: The deadline for bidder inquiries was April 3, 2026. A pre-bid site visit was held on March 11, 2026.
Key Documents & Amendments
Multiple amendments have been issued. Amendment 0004 (posted April 10, 2026) is the latest, updating the pricing schedule (adding "Separator Wall Backfill"), various technical specifications (Measurement & Payment, Steel Pipe Piles, Dredging), and several drawings. Bidders must thoroughly review all issued amendments, specifications, and plan sets to ensure compliance with the latest requirements.
Contacts
- Primary: Angie Grimes (angie.l.grimes@usace.army.mil, 314-331-8965)
- Secondary: Whitney Dee (whitney.r.dee@usace.army.mil, 314-332-8621)