LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

SOL #: W912P926RA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST ST LOUIS
SAINT LOUIS, MO, 63103-2833, United States

Place of Performance

Winfield, MO

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 26, 2025
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 24, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U. S. Army Corps of Engineers, St. Louis District, is soliciting proposals for Lock Foundation and Site Preparation for the Lock and Dam 25 Navigation Ecosystem Sustainability Program (NESP) in Winfield, MO. This is a Firm Fixed-Price Construction contract with an estimated value of $54,000,000. Proposals are due by April 24, 2026, at 3:00 PM CST.

Scope of Work

This project involves comprehensive construction activities for the lock foundation and site preparation. The lock foundation work includes excavation and disposal of existing scour protection riprap, dredging and placement of sand fill, and placement of a riprap berm. It also requires the construction of a sheet pile separator wall braced with piles, and a deflector on the downstream side of the dam to route water. The site preparation work entails placing additional dredge borrow upland for a future staging and laydown area and installing a sanitary outfall pipe. Detailed engineering drawings and specifications are provided across multiple plan sets, covering civil, structural, hydrographic, and geotechnical aspects.

Contract Details

  • Contract Type: Firm Fixed-Price Construction
  • Estimated Value: $54,000,000
  • Period of Performance: 365 calendar days for Site Preparation and 548 calendar days for Lock Foundation, following an estimated Notice to Proceed (NTP) on August 14, 2026.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction - Dredging Activities)
  • Small Business Size Standard: $45,000,000
  • Set-Aside: Full and Open Competition
  • Place of Performance: Winfield, MO 63389

Submission & Evaluation

Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module by April 24, 2026, at 3:00 PM CST. Emailed or physical proposals will not be accepted. A Bid/Offer Guarantee is required.

Evaluation will be based on a Subjective Best Value Trade-Off considering four factors:

  1. Construction Approach: (Equally important as Past Performance, more important than Small Business Participation) Assesses understanding of project requirements, complexity, logical work sequence, and risk mitigation, including Site Layout, Underwater Excavation/Dredging, Separator Wall Installation, and Schedule.
  2. Past Performance: (Equally important as Construction Approach, more important than Small Business Participation) Evaluated for recency (within 15 years) and relevancy (scope, complexity, magnitude, dollar value).
  3. Small Business Participation: (Less important than Factors 1 & 2) Evaluates commitment to a 25% small business subcontracting target.
  4. Price: (Equally important as Factors 1, 2, & 3 combined) Evaluated for reasonableness and realism.

A Project Labor Agreement (PLA) compliant with FAR clauses 52.222-33 and 52.222-34 is mandatory for award. Offerors must achieve at least a "Marginal" rating for all non-cost factors. Inquiries were due by April 3, 2026.

Key Documents

Bidders must review the latest Amendment 0005, updated Pricing Schedules (Amendment 0004), and comprehensive Specifications (Amendment 0004), along with the detailed Plan Sets (Parts 1-8), which include engineering drawings, hydrographic data, and material specifications.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 14
Solicitation
Posted: Apr 23, 2026
View
Version 13Viewing
Solicitation
Posted: Apr 16, 2026
Version 12
Pre-Solicitation
Posted: Apr 14, 2026
View
Version 11
Solicitation
Posted: Apr 10, 2026
View
Version 10
Solicitation
Posted: Mar 27, 2026
View
Version 9
Solicitation
Posted: Mar 4, 2026
View
Version 8
Solicitation
Posted: Feb 24, 2026
View
Version 7
Solicitation
Posted: Feb 23, 2026
View
Version 6
Pre-Solicitation
Posted: Jan 22, 2026
View
Version 5
Pre-Solicitation
Posted: Jan 22, 2026
View
Version 4
Pre-Solicitation
Posted: Jan 15, 2026
View
Version 3
Sources Sought
Posted: Sep 5, 2025
View
Version 2
Sources Sought
Posted: Mar 5, 2025
View
Version 1
Sources Sought
Posted: Feb 26, 2025
View
LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP) | GovScope