OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0

SOL #: 69056725B000011Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Gilchrist, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 19, 2025
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Feb 11, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for Road 60 Improvements, MP 0 - 1.0 in the Deschutes National Forest, Klamath County, Oregon. This is a Total Small Business Set-Aside construction project with an estimated value between $700,000 and $2,000,000. Bids are due February 11, 2026.

Scope of Work

This project involves the construction of roads and bridges on Federal Highway Projects, adhering to the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14." Key deliverables for the 1.0 to 1.02-mile segment include:

  • Road Surface: Full Depth Reclamation (6-inch depth), asphalt concrete pavement (3-inch compacted depth in two lifts), asphalt tack coat, asphalt pavement milling, and placement of a 2-inch crushed aggregate layer prior to pulverization for the FDR process.
  • Ancillary Work: Cleaning of 12-inch and 18-inch culverts, turf establishment, permanent pavement markings, and temporary traffic control measures (flaggers, construction signs, tubular markers).
  • Environmental & Quality: Soil erosion control (fiber roll, rolled erosion control product), construction survey and staking, contractor quality control, and preservation of existing communication and electric utilities.

Contract Details

  • Type: Firm-Fixed-Price Invitation for Bids (IFB).
  • Estimated Value: $700,000 to $2,000,000.
  • Completion Date: Work must be completed by July 2, 2026, with commencement within 10 calendar days after notice to proceed.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).

Submission & Evaluation

  • Bids must be submitted as printed copies only; electronic, facsimile, or email bids are NOT authorized.
  • Bidders must use Standard Form 1442 for submission.
  • A bid bond is mandatory, and its absence will lead to rejection.
  • The bid opening date is specified on page A-3, Block 13A of the IFB.
  • Questions must be submitted in writing at least five business days before the due date, with answers posted on SAM.gov.
  • Prospective bidders were encouraged to view the project site during the fall due to potential snow impeding access. No government-led site visits will be provided.

Key Dates

  • Published Date: January 30, 2026
  • Bid Due Date: February 11, 2026, 22:00 UTC

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

View
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: Feb 25, 2026
View
Version 12
Solicitation
Posted: Feb 24, 2026
View
Version 11
Solicitation
Posted: Feb 17, 2026
View
Version 10
Solicitation
Posted: Feb 11, 2026
View
Version 9
Solicitation
Posted: Feb 11, 2026
View
Version 8
Solicitation
Posted: Feb 9, 2026
View
Version 7
Solicitation
Posted: Feb 4, 2026
View
Version 6Viewing
Solicitation
Posted: Jan 30, 2026
Version 5
Solicitation
Posted: Dec 31, 2025
View
Version 4
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 3
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 2
Pre-Solicitation
Posted: Oct 3, 2025
View
Version 1
Pre-Solicitation
Posted: Aug 19, 2025
View