OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0

SOL #: 69056725B000011Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Gilchrist, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 19, 2025
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Feb 24, 2026, 10:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for Road 60 Improvements, MP 0 - 1.0 within the Deschutes National Forest, Klamath County, Oregon. This Total Small Business Set-Aside project involves approximately one mile of road reconstruction. Bids are due by February 24, 2026, at 1430 PT.

Scope of Work

This construction project, designated OR FS DSHUT601 60(1), focuses on improving a 1.0 to 1.02-mile section of Road 60. Key deliverables include:

  • Road Surface: Full depth reclamation (6-inch), asphalt concrete pavement (3-inch compacted depth in two lifts), asphalt tack coat, pavement milling, and incorporation of 2-inch crushed aggregate into the stabilized base.
  • Drainage & Erosion: Cleaning of 12-inch and 18-inch culverts, soil erosion control (fiber roll, rolled erosion control product), and turf establishment (revised by Amendment A003).
  • Traffic & Safety: Pavement markings (Type B), temporary traffic control measures (including pilot car, construction signs, tubular markers, flaggers), and permanent sign systems.
  • Ancillary: Construction survey and staking, contractor quality control and assurance, and preservation of existing communication and electric utilities.

Contract Details

  • Type: Firm-Fixed-Price Invitation for Bids (IFB).
  • Estimated Value: Between $700,000 and $2,000,000.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Specifications: Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, using U.S. Customary units.
  • Completion: Work must commence within 10 calendar days of Notice to Proceed and be completed by July 2, 2026.

Submission & Evaluation

  • Bids Due: February 24, 2026, at 1430 PT.
  • Method: Printed bids only, submitted on Standard Form 1442. Electronic, facsimile, or email bids are not authorized.
  • Requirements: A bid bond is mandatory. Bidders must acknowledge all amendments.
  • Q&A: General and technical questions must be submitted in writing at least five business days before the due date; answers will be posted on SAM.gov.
  • Site Visit: Prospective bidders were encouraged to view the project site during fall 2025 due to potential winter access issues; no government-provided “show-me” tours.

Key Updates & Notes

  • Amendment A003 (Feb 17, 2026): Extended the bid opening date to February 24, 2026, 1430 PT. Modified the bid schedule by deleting “Turf Establishment” (A0320) and adding “Temporary Traffic Control, Pilot Car” (A0510). Revised Special Contract Requirements and several plan sheets.
  • Amendment A001 (Feb 4, 2026): Updated the Davis-Bacon Wage Decision, introduced “Masterworks” for electronic documentation, and revised various contract requirements and plan sheets.
  • Clarifications: Digital design files (LandXML, DXF, CAD) will not be provided; contractors are responsible for all construction surveying. The 2-inch crushed aggregate for Full Depth Reclamation is placed prior to pulverization, with payment incidental to the FDR pay item.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
View
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: Feb 25, 2026
View
Version 12
Solicitation
Posted: Feb 24, 2026
View
Version 11Viewing
Solicitation
Posted: Feb 17, 2026
Version 10
Solicitation
Posted: Feb 11, 2026
View
Version 9
Solicitation
Posted: Feb 11, 2026
View
Version 8
Solicitation
Posted: Feb 9, 2026
View
Version 7
Solicitation
Posted: Feb 4, 2026
View
Version 6
Solicitation
Posted: Jan 30, 2026
View
Version 5
Solicitation
Posted: Dec 31, 2025
View
Version 4
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 3
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 2
Pre-Solicitation
Posted: Oct 3, 2025
View
Version 1
Pre-Solicitation
Posted: Aug 19, 2025
View
OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0 | GovScope