OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0

SOL #: 69056725B000011Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Gilchrist, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 19, 2025
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Feb 19, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for Road 60 Improvements, MP 0 - 1.0 in the Deschutes National Forest, Klamath County, Oregon. This project, designated OR FS DSHUT601 60(1), is a Total Small Business Set-Aside. The work involves significant road reconstruction and associated improvements. Bids are due by February 19, 2026, at 1400 local time.

Scope of Work

The project encompasses approximately 1.02 miles of Road 60, focusing on "Grinding asphalt, adding base rock, new pavement and striping." Key deliverables include:

  • Full depth reclamation (6-inch depth)
  • Asphalt concrete pavement (Type 1, 3-inch compacted depth in two lifts)
  • Asphalt pavement milling and tack coat application
  • Crushed aggregate (2-inch depth, incidental to full depth reclamation pay item)
  • Cleaning of 12-inch and 18-inch culverts
  • Turf establishment and soil erosion control (fiber roll, rolled erosion control product)
  • Pavement markings (Type B: solid/broken white/yellow, stop lines) and sign systems
  • Temporary traffic control measures (tubular markers, construction signs, flaggers)
  • Preservation and protection of existing communication and electric utilities.

Contract Details

  • Contract Type: Invitation for Bids (IFB), anticipated Firm-Fixed-Price.
  • Estimated Value: $700,000 to $2,000,000.
  • Completion Date: Work must be completed by July 2, 2026, commencing within 10 calendar days of Notice to Proceed.
  • Specifications: Based on "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14," using U.S. Customary units.
  • Amendments: Amendment A001 revised documentation requirements (Masterworks), updated the Davis-Bacon wage schedule (OR20260001), and modified specific plan sheets. Amendment A002 extended the bid opening date.

Key Requirements & Clarifications

  • Surveyor Responsibilities: Contractors are responsible for all construction surveying; digital design files will not be provided by the Government.
  • Material: The 2-inch crushed aggregate layer for Full Depth Reclamation should be placed prior to pulverization and is incidental to Pay Item Number "30402-5300".
  • Future Amendments: Amendment A003 is expected to address pilot car needs, turf establishment date discrepancies, and payment for unsuitable material removal.

Submission & Evaluation

  • Bid Submission: Printed copies only; electronic bids, facsimile, and email bids are not authorized. Bids must be submitted on Standard Form 1442.
  • Bid Bond: A bid bond is required.
  • Questions: General and technical questions must be submitted in writing at least five business days before the due date. Answers will be posted on SAM.gov.
  • Site Visit: Prospective bidders were encouraged to view the project site during the fall due to potential winter access issues; no Government-provided "show-me" tours.

Contact Information

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
View
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: Feb 25, 2026
View
Version 12
Solicitation
Posted: Feb 24, 2026
View
Version 11
Solicitation
Posted: Feb 17, 2026
View
Version 10Viewing
Solicitation
Posted: Feb 11, 2026
Version 9
Solicitation
Posted: Feb 11, 2026
View
Version 8
Solicitation
Posted: Feb 9, 2026
View
Version 7
Solicitation
Posted: Feb 4, 2026
View
Version 6
Solicitation
Posted: Jan 30, 2026
View
Version 5
Solicitation
Posted: Dec 31, 2025
View
Version 4
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 3
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 2
Pre-Solicitation
Posted: Oct 3, 2025
View
Version 1
Pre-Solicitation
Posted: Aug 19, 2025
View