OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0

SOL #: 69056725B000011Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Gilchrist, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 19, 2025
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Feb 11, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for Road 60 Improvements, MP 0 - 1.0, located in the Deschutes National Forest, Klamath County, Oregon. This Total Small Business Set-Aside construction project is estimated between $700,000 and $2,000,000, with a fixed completion date of July 2, 2026. Bids are due by February 11, 2026.

Scope of Work

This project involves approximately 1.02 miles of road construction, including:

  • Road Surface: Grinding asphalt, full depth reclamation (6-inch depth), application of 2-inch crushed aggregate (prior to pulverization), and new asphalt concrete pavement (3-inch compacted depth in two lifts).
  • Ancillary Work: Tack coat application, asphalt pavement milling, cleaning of 12-inch and 18-inch culverts, turf establishment, soil erosion and sediment control (fiber roll, rolled erosion control product), and preservation of existing utilities.
  • Traffic Control: Installation of permanent pavement markings (Type B), temporary traffic control measures (tubular markers, construction signs, flaggers), and a permanent sign system.
  • All work must adhere to the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14".

Contract Details

  • Type: Firm-Fixed-Price Invitation for Bids (IFB).
  • Estimated Value: $700,000 to $2,000,000.
  • Completion: Work must commence within 10 calendar days after notice to proceed and be completed by July 2, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Wage Determination: The Davis-Bacon General Wage Decision Number has been updated to OR20260001, effective January 23, 2026, per Amendment A001.
  • Contract Administration: The FHWA's procedures for definitization of equitable adjustments for change orders (FAR 36.211) apply.

Submission & Evaluation

  • Bids Due: February 11, 2026, 22:00 UTC.
  • Submission Method: Bids must be submitted as printed copies on Standard Form 1442. Electronic, facsimile, or email bids are not authorized.
  • Bid Bond: A bid bond is required, and bids without a valid bid bond will be rejected.
  • Questions: General and technical questions must be submitted in writing at least five business days before the bid due date. Answers will be posted on SAM.gov.
  • Amendment A001: Introduces a "Masterworks" subsection for documentation, revises requirements for electronic documentation, measurement of work, pricing adjustments, progress payments, and Contractor Quality Control. Bidders should review all updated sections carefully.

Additional Notes

Prospective bidders were encouraged to view the project site during the fall, as snow may impede viewing. No Government personnel will be available for show-me tours.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
View
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: Feb 25, 2026
View
Version 12
Solicitation
Posted: Feb 24, 2026
View
Version 11
Solicitation
Posted: Feb 17, 2026
View
Version 10
Solicitation
Posted: Feb 11, 2026
View
Version 9
Solicitation
Posted: Feb 11, 2026
View
Version 8
Solicitation
Posted: Feb 9, 2026
View
Version 7Viewing
Solicitation
Posted: Feb 4, 2026
Version 6
Solicitation
Posted: Jan 30, 2026
View
Version 5
Solicitation
Posted: Dec 31, 2025
View
Version 4
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 3
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 2
Pre-Solicitation
Posted: Oct 3, 2025
View
Version 1
Pre-Solicitation
Posted: Aug 19, 2025
View