OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0

SOL #: 69056725B000011Pre-Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Gilchrist, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 19, 2025
2
Last Updated
Feb 25, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, under the Department of Transportation, issued an Invitation for Bids (IFB) for OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0. This project, located in the Deschutes National Forest, Klamath County, Oregon, was a Total Small Business Set-Aside for road construction services. The bidding period has concluded, with bid tabulations and a bid summary posted on February 24-25, 2026, detailing offers received from multiple contractors.

Project Scope

The project involved comprehensive improvements to a 1.0 to 1.02-mile section of Road 60. Key deliverables included:

  • Full depth reclamation (6-inch depth) and asphalt concrete pavement (3-inch compacted depth).
  • Asphalt pavement milling, tack coat application, and crushed aggregate placement.
  • Cleaning of 12-inch and 18-inch culverts.
  • Turf establishment and soil erosion control measures (fiber roll, rolled erosion control product).
  • Pavement markings (Type B: solid/broken white/yellow, stop lines) and permanent sign systems.
  • Temporary traffic control (tubular markers, construction signs, flaggers, pilot car).
  • Preservation and protection of existing communication and electric utilities.

Contract Details

  • Contract Type: Firm-Fixed-Price (anticipated).
  • Estimated Value: $700,000 to $2,000,000.
  • Completion Date: Work to be completed not later than July 2, 2026.
  • Specifications: Based on "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14".
  • Location: Approximately 14 miles west of Gilchrist, OR, within the Deschutes National Forest.

Submission & Evaluation

Bids were required to be submitted as printed copies on Standard Form 1442, with a bid bond. Electronic bids were not accepted. The bid opening date was extended multiple times via amendments, with the final due date being February 24, 2026, at 1430 PT. Questions and answers clarified details on surveyor responsibilities, erosion control substitutions, turf establishment, traffic signals, and full depth reclamation, with several items addressed by Amendment A003.

Key Updates & Results

  • Amendment A001 (Feb 4, 2026): Updated wage schedules, added "Masterworks" system requirements, and revised special contract requirements and plan sheets.
  • Amendment A002 (Feb 9, 2026): Extended bid opening date to February 19, 2026.
  • Amendment A003 (Feb 17, 2026): Further extended bid opening to February 24, 2026, at 1430 PT, deleted "Turf Establishment" item A0320, and added "Temporary Traffic Control, Pilot Car" item A0510, and revised several plan sheets and special contract requirements.
  • Bid Results (Feb 24-25, 2026): A bid summary and detailed bid tabulations were posted, showing five contractors submitted offers, with JAL Construction, Inc. submitting the lowest responsive bid at $561,276.00, significantly below the Engineer's Estimate of $1,421,148.00.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download

Versions

Version 13
Solicitation
Posted: Feb 25, 2026
View
Version 12
Solicitation
Posted: Feb 24, 2026
View
Version 11
Solicitation
Posted: Feb 17, 2026
View
Version 10
Solicitation
Posted: Feb 11, 2026
View
Version 9
Solicitation
Posted: Feb 11, 2026
View
Version 8
Solicitation
Posted: Feb 9, 2026
View
Version 7
Solicitation
Posted: Feb 4, 2026
View
Version 6
Solicitation
Posted: Jan 30, 2026
View
Version 5
Solicitation
Posted: Dec 31, 2025
View
Version 4
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 3
Pre-Solicitation
Posted: Dec 12, 2025
View
Version 2Viewing
Pre-Solicitation
Posted: Oct 3, 2025
Version 1
Pre-Solicitation
Posted: Aug 19, 2025
View