Phase V Multiple BEQ Room Entry Door Lock Repairs

SOL #: N4008526R9029Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Submission Deadline
May 12, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Phase V Multiple BEQ Room Entry Door Lock Repairs at Marine Corps Base Camp Lejeune, North Carolina. This project involves replacing existing locksets with new swipe lock systems in multiple Bachelor Enlisted Quarters (BEQ) buildings. This opportunity is a Total Small Business Set-Aside and is open only to M&R MACC Contractors listed on the General Requirements cover page. Proposals are due May 11, 2026, at 2:00 PM EST.

Scope of Work

The primary objective is to replace existing locksets on living area doors in multiple BEQ buildings (specifically 36 buildings are detailed in the SOW) with new Ving Card Signature RFID electronic lock systems. The scope includes:

  • Installation of new locksets compatible with ANSI/BHMA A156.2 (Series 4000, Grade 1) and A156.3 (Grade 1) standards.
  • Provision of cylinders and cores compatible with Best Locks M-Series (7) pin and high-security cylinders.
  • Supply and installation of a front desk system (computer, monitor, Ving Vision software, RFID encoder), spare locksets, service terminals, RFID contact cards, and 1500 resident/100 staff RFID cards.
  • Implementation of a master keying system for each floor and a key cabinet for BEQ PP2.
  • The facility will remain operational throughout the 540-day construction period, requiring minimal interference.
  • Contractor is responsible for protecting existing work, verifying underground utilities, and providing training for the new lock system.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
  • Estimated Cost Range: Between $1,000,000 and $5,000,000
  • Period of Performance: 540 days after award
  • Proposal Due Date: May 11, 2026, 2:00 PM EST
  • Requests for Information (RFIs) Cut-off: April 24, 2026, 3:00 PM EST
  • Site Visit: April 16, 2026, at 1000 at HP265
  • Proposal Acceptance Period: 60 days from receipt of offers
  • Published Date: April 10, 2026

Submission & Evaluation

Proposals must be emailed to edward.e.pelser.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil. Award will be based on the Lowest Price. Offerors must adhere to Buy American Requirements for Construction Materials. Bid, payment, and performance bonds are required based on proposal value. Executive Orders 13706 (Paid Sick Leave) and 13658 (Minimum Wage) apply.

Special Requirements & Notes

This opportunity is restricted to M&R MACC Contractors listed on the General Requirements cover page. Offerors should review the provided Submittal Register to understand all required documentation and reporting. A Contractor Environmental Guide is also provided, outlining critical environmental regulations and compliance requirements for work performed at MCB Camp Lejeune. Funding availability is not guaranteed, and no award will be made if funds are not available.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
Phase V Multiple BEQ Room Entry Door Lock Repairs | GovScope