Raul Hector Castro Douglas AZ Land Port of Entry Design-Build

SOL #: 47PK0125R0002Solicitation

Overview

Buyer

General Services Administration
Public Buildings Service
PBS R9 AMD CAPITAL PROJECTS
SAN FRANCISCO, CA, 94102, United States

Place of Performance

Douglas, AZ

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Administrative Facilities And Service Buildings (Y1AZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 14, 2026
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Apr 2, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The General Services Administration (GSA) is seeking a Design-Build (DB) General Construction Contractor for the Raul Hector Castro (RHC) Land Port of Entry (LPOE) in Douglas, AZ. This project involves the demolition, modernization, and expansion of the existing facilities while maintaining continuous inspection operations. Proposals are due April 2, 2026.

Opportunity Details

This solicitation (No. 47PK0125R0002) is for a Firm-Fixed-Price Design-Build contract to deliver the RHC LPOE project. The scope includes expanding the Port to the west and north of the current site. Bidders must account for the complexity of maintaining commercial and non-commercial inspection activities without interruption throughout the construction period.

Key Requirements & Deliverables

  • Design and Construction: Full design and construction services for the RHC LPOE.
  • Demolition & Modernization: Removal of existing structures and upgrading facilities.
  • Expansion: Extending the Port's footprint.
  • Operational Continuity: Ensuring uninterrupted inspection activities during all project phases.
  • Project Schedule: Submission of a detailed schedule within 90 days of Notice to Proceed (NTP).
  • Submittals: Preparation and submission of shop drawings, samples, calculations, and product information.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price Design-Build.
  • Period of Performance:
    • Design Phase: Commences 1 day after NTP.
    • Substantial Completion: No later than 1916 calendar days from NTP.
    • Contract Completion: Within 90 calendar days of Substantial Completion (total 1946 days from NTP).
  • Liquidated Damages: $10,093.36 per calendar day for failure to achieve Substantial Completion.
  • Bid Guarantee: 20% of bid price or $3,000,000, whichever is less.
  • Bonding: Performance and Payment Bonds required within 30 days after award.
  • Prevailing Wages: Wage Determination AZ20260038 for Cochise County, AZ applies.

Submission & Evaluation

  • Proposal Due Date: April 2, 2026, by 3:00 PM Pacific Time Zone.
  • Submission Format: Emailed electronic versions for Technical/Management Proposal (max 35 pages) and a separate Pricing Proposal. Email size limit is 25MB per email.
  • Required Documents: Price Proposal (using provided form), Technical Proposal, Representations and Certifications, SF 24 (Bid Bond), Small Business Subcontracting Plan (for large businesses), GSA Form 527 (Contractor's Qualifications and Financial Information), Proprietary Information Agreement(s), and a Past Performance Questionnaire.
  • Evaluation Method: Best Value Tradeoff. Non-price factors (Past Experience of General Contractor, Technical and Management Approach, Lead Designer, Past Performance of General Contractor, Small Business Utilization) are significantly more important than Total Evaluated Price.
  • Mandatory Requirements: Active SAM registration, completed Reps & Certs, SF 24, GSA Form 527, and SF 1442.
  • Access to Attachments: Statement of Work, Specifications, and Drawings require a GSA Affiliated Customer Account (GACA). Instructions for GACA creation are provided.

Key Dates & Actions

  • Pre-Proposal & Site Visit RSVP Due: February 12, 2026.
  • Virtual Pre-Proposal Conference: February 17, 2026, at 10:00 AM Mountain Time Zone.
  • Site Visit: February 25, 2026, at 1:00 PM Mountain Time Zone, Douglas, AZ. A CBP security quick-check is required for attendees.
  • Requests for Information (RFI): Submit via the provided Google intake link.
  • Contact: Daniel Ramirez (daniel.ramirez@gsa.gov).

Important Considerations

Firms contracting with Line and Space, Stantec, Inc., and Rider Levett Bucknall may have an Organizational Conflict of Interest (OCI).

People

Points of Contact

Daniel RamirezPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 7
Solicitation
Posted: Mar 10, 2026
View
Version 6
Solicitation
Posted: Feb 25, 2026
View
Version 5
Solicitation
Posted: Feb 19, 2026
View
Version 4
Solicitation
Posted: Feb 18, 2026
View
Version 3
Solicitation
Posted: Feb 13, 2026
View
Version 2Viewing
Solicitation
Posted: Feb 2, 2026
Version 1
Pre-Solicitation
Posted: Jan 14, 2026
View