Roof Repairs Bldgs HP225, HP235, HP245, HP275, HP285, & HP295

SOL #: N4008526R9017Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 23, 2026
2
Last Updated
Apr 16, 2026
3
Submission Deadline
Apr 20, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Roof Repairs on Buildings HP225, HP235, HP245, HP275, HP285, & HP295 at Marine Corps Base Camp Lejeune, NC. This opportunity is a Total Small Business Set-Aside and is open only to pre-qualified Roofing MACC Contractors. Proposals are due by April 20, 2026, at 12:00 PM.

Scope of Work

This project involves the comprehensive replacement of existing shingle roof systems with new standing seam metal roofing systems on the specified Bachelor Enlisted Quarters (BEQ) buildings. The scope includes:

  • Removal and disposal of existing roof systems down to the deck.
  • Repair or replacement of up to 5% of damaged roof decking.
  • Installation of new aluminum drip edge, self-adhering ice and water membrane underlayment, and elastomeric expansion joints.
  • Installation of new aluminum standing seam metal roofing systems with vented ridge caps, designed to withstand 150 mph winds.
  • Installation of pipe boots for existing vent pipes and permanent fall protection systems.
  • Repair and refinish areas damaged or disturbed by new work.
  • The contract completion time has been extended to 720 days.
  • Special Requirements: Contractors must coordinate site access, security, and utility shutdowns, minimize interference with facility operations, and handle hazardous materials (asbestos, lead-based paint on fascia) according to regulations. Compliance with OSHA, UFC criteria, and building codes is mandatory.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to pre-qualified Roofing MACC Contractors (e.g., Achuti, Apex, Quality Roofers, Riza, Seashore, Yerkes South).
  • Estimated Value: Between $5,000,000 and $10,000,000.
  • Liquidated Damages: $880 per Calendar Day.
  • Bond Requirements: Payment bond required for proposals $35K+, and bid, payment, and performance bonds for $150K+.
  • Buy American Act: Applies to construction materials.

Submission & Evaluation

  • Proposal Due Date: April 20, 2026, at 12:00 PM.
  • Submission Method: Proposals must be submitted via email to clifton.l.gaither.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
  • Pricing: Bidders must use the latest Revised Pricing Sheet (Amend 0007), which details 8 Exhibit Line Item Numbers (ELINs) covering specific building repairs, roof truss repair/replacement, and underlayment replacement. All ELINs must be priced, including all applicable costs, overhead, and profit.
  • Evaluation: Award will be based on the Lowest Price, determined by adding the prices for ELINs 0001 through 0008.
  • Acknowledgement: All amendments (including 0001, 0002, 0003, 0004, 0005, 0006, and 0007) must be acknowledged with the proposal; failure to do so may result in rejection.

Key Amendments & Clarifications

  • Scope Change: Building HP215 has been removed from the project scope (Amend 0006).
  • Completion Time: Contract completion time extended to 720 days (Amend 0005).
  • Pricing Sheet: The latest pricing sheet (Amend 0007) includes 8 ELINs and must be used.
  • Roof Sheathing: 19/32" OSB for all buildings.
  • Downspouts: 6x6 tubular steel downspouts required for HP225, HP235, HP245, HP275, and HP285 (Amend 0005).

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8Viewing
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
Version 7
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Roof Repairs Bldgs HP225, HP235, HP245, HP275, HP285, & HP295 | GovScope