SOLICITATION: Construction of a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) building in Leeville, LA (LEV)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Aviation Administration (FAA) is soliciting proposals for the construction of a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) building in Leeville, LA (LEV). This is a Firm Fixed Price (FFP) contract with an estimated value between $8M-$13M. The competition is unrestricted, and award will be made to the Lowest Price Technically Acceptable (LPTA) offeror. Proposals are due by June 30, 2026, at 4:00 PM Central Time.
Scope of Work
The project involves constructing a new elevated VORTAC platform (deck at 32' 5"), installing the VORTAC system, including a lightning protection system, and providing all necessary labor, materials, equipment, and supervision. Key tasks include site preparation, utility installation, foundations (concrete piles, reinforced concrete mat), structural steel framing, equipment shelter installation, and antenna setup. The work must start within 15 days after Notice to Proceed and be completed by December 31, 2027. Coordination of shutdowns with FAA Air Traffic Management requires 30 days' notice.
Key Requirements & Submissions
Offerors must submit a completed SIR document, Technical Approach Plan, Organizational Experience Questionnaire (OEQ), Key Personnel List, and a Safety and Security Plan. A Fully Executed SF-24 Bid Bond is required with the proposal, and SF-25 Performance Bond and SF-25A Payment Bond will be required upon award. The Geotechnical Report for the site is available and crucial for foundation design. Bidders must also adhere to prevailing wage rates for Lafourche County, LA, as specified in the Wage Determination document.
Amendments & Clarifications
Multiple amendments have been issued:
- Amendment 0002 (May 14, 2026) extended the SIR due date to June 30, 2026, and added clauses for Small Business Subcontracting Plan and Changes-Construction, along with the SF-24, SF-25, and SF-25A bonding forms.
- Amendment 0001 (April 27, 2026) added a clause regarding Addressing DEI Discrimination by Federal Contractors (Executive Order 14398) and included the OEQ and Geotechnical Report as attachments.
- Pre-Proposal RFIs (May 22, 2026) confirmed the SIR extension, clarified that no HUBZone preference applies, and specified that the project is unrestricted. It also provided details on delegated design items (e.g., piles, monitor pole) and confirmed the availability of road As-Builts.
Site Visit & Questions
A site visit was held on May 5, 2026. All questions regarding the project must be submitted in writing via email to Stephen.N.Branch@faa.gov no later than 10 days prior to the solicitation closing date (i.e., June 20, 2026).