TINKER AFB MAC BOA WWYK150083 - Repair Transformer Vault 6, B9001

SOL #: FA813726R0008Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Restoration Of Real Property (Public Or Private) (Z2QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 21, 2026
2
Last Updated
Mar 13, 2026
3
Response Deadline
Mar 13, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is issuing a Presolicitation for the repair of Transformer Vault 6, Building 9001 at Tinker Air Force Base, Oklahoma. This opportunity is exclusively for Tinker AFB MAC BOA Holders Only. The project involves significant electrical infrastructure replacement and facility repairs, with an estimated magnitude between $1,000,000 and $5,000,000. A mandatory initial site visit is scheduled for February 5, 2026, and interested MAC BOA holders must RSVP by February 4, 2026, at noon CST. The solicitation (RFP) is currently in draft and will be posted once available.

Scope of Work

The project, titled "WWYK150083 - Repair Transformer Vault 6, B9001," requires furnishing all materials, labor, and equipment to accomplish the repair by replacement of two gas-filled 2000KVA transformers, associated 480V switch gear (#6C and #6D), all 15KV switches, and the original 3000A tie bus. Additionally, the work includes repairing interior lighting, adding visual fire alarm notification devices to meet ABA requirements, and repairing the vault's exterior. The Statement of Work (SOW) details requirements for quality control, site investigation, and necessary logistical, architectural, and structural work. The project location is within Bldg. 9001, requiring escorts for personnel accessing controlled areas.

Contract & Timeline

  • Type: Presolicitation (leading to RFP FA813726R0008)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Magnitude: Between $1,000,000 and $5,000,000
  • Published Date: February 2, 2026
  • Site Visit RSVP Due: February 4, 2026, by 12:00 PM CST
  • Mandatory Initial Site Visit: February 5, 2026, at 1:00 PM CST
  • Requests for Information (RFIs) Due: February 17, 2026, by 4:00 PM CST
  • Anticipated Response Date (Solicitation): March 13, 2026

Key Instructions & Requirements

This opportunity is restricted to Tinker AFB MAC BOA Holders Only. Attendance at the initial site visit is mandatory for eligibility to propose. Bidders must RSVP for the site visit via email, indicating base access status and providing an Entry Access List (EAL) if base access is required for personnel. Project-specific documents, including the SOW, Wage Determination, Submittal Register, and Drawings, are attached. The Wage Determination specifies prevailing wage rates for Oklahoma County. The Submittal Register outlines all required contractor submissions. All documents must be submitted electronically, with specific file naming conventions. Contractor personnel must have valid licenses, certifications, and obtain AFMC Form 387 badges. Key personnel (PM, QCM, SSHO, Project Superintendent) have specific experience requirements. Quality control, health and safety, and bioenvironmental regulations must be strictly adhered to.

Contact Information

People

Points of Contact

Sara HindsPRIMARY
Megan DonagheSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 6
Pre-Solicitation
Posted: Mar 13, 2026
View
Version 5
Pre-Solicitation
Posted: Mar 12, 2026
View
Version 4
Pre-Solicitation
Posted: Mar 4, 2026
View
Version 3
Pre-Solicitation
Posted: Feb 17, 2026
View
Version 2Viewing
Pre-Solicitation
Posted: Feb 2, 2026
Version 1
Pre-Solicitation
Posted: Jan 21, 2026
View