TINKER AFB MAC BOA WWYK150083 - Repair Transformer Vault 6, B9001
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is issuing a Presolicitation for the repair of Transformer Vault 6, Building 9001 at Tinker Air Force Base, Oklahoma. This opportunity is exclusively for Tinker AFB MAC BOA Holders Only. The project involves significant electrical infrastructure replacement and facility repairs, with an estimated magnitude between $1,000,000 and $5,000,000. A mandatory initial site visit is scheduled for February 5, 2026, and interested MAC BOA holders must RSVP by February 4, 2026, at noon CST. The solicitation (RFP) is currently in draft and will be posted once available.
Scope of Work
The project, titled "WWYK150083 - Repair Transformer Vault 6, B9001," requires furnishing all materials, labor, and equipment to accomplish the repair by replacement of two gas-filled 2000KVA transformers, associated 480V switch gear (#6C and #6D), all 15KV switches, and the original 3000A tie bus. Additionally, the work includes repairing interior lighting, adding visual fire alarm notification devices to meet ABA requirements, and repairing the vault's exterior. The Statement of Work (SOW) details requirements for quality control, site investigation, and necessary logistical, architectural, and structural work. The project location is within Bldg. 9001, requiring escorts for personnel accessing controlled areas.
Contract & Timeline
- Type: Presolicitation (leading to RFP FA813726R0008)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Magnitude: Between $1,000,000 and $5,000,000
- Published Date: February 2, 2026
- Site Visit RSVP Due: February 4, 2026, by 12:00 PM CST
- Mandatory Initial Site Visit: February 5, 2026, at 1:00 PM CST
- Requests for Information (RFIs) Due: February 17, 2026, by 4:00 PM CST
- Anticipated Response Date (Solicitation): March 13, 2026
Key Instructions & Requirements
This opportunity is restricted to Tinker AFB MAC BOA Holders Only. Attendance at the initial site visit is mandatory for eligibility to propose. Bidders must RSVP for the site visit via email, indicating base access status and providing an Entry Access List (EAL) if base access is required for personnel. Project-specific documents, including the SOW, Wage Determination, Submittal Register, and Drawings, are attached. The Wage Determination specifies prevailing wage rates for Oklahoma County. The Submittal Register outlines all required contractor submissions. All documents must be submitted electronically, with specific file naming conventions. Contractor personnel must have valid licenses, certifications, and obtain AFMC Form 387 badges. Key personnel (PM, QCM, SSHO, Project Superintendent) have specific experience requirements. Quality control, health and safety, and bioenvironmental regulations must be strictly adhered to.
Contact Information
- Primary Contact: Sara Hinds (sara.hinds.2@us.af.mil)
- Secondary Contact: Megan Donaghe (megan.donaghe@us.af.mil, 7303205014)