TINKER AFB MAC BOA WWYK150083 - Repair Transformer Vault 6, B9001
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for Repair Transformer Vault 6, Building 9001 (WWYK150083) at Tinker Air Force Base, Oklahoma. This project involves the repair and replacement of critical electrical infrastructure. This opportunity is a Total Small Business Set-Aside and is restricted to Tinker AFB MAC BOA holders only. Proposals are due by March 25, 2026, at 4:00 PM CST.
Scope of Work
The project entails furnishing all materials, labor, and equipment to repair and replace two gas-filled 2000KVA transformers, associated 480V switch gear (#6C and #6D), all 15KV switches, and the original 3000A tie bus in Transformer Vault 6, Building 9001. Additional work includes repairing interior lighting, adding visual fire alarm notification devices to meet ABA requirements, and repairing the vault's exterior. The work will adhere to the 2025 Tinker AFB electrical standards. No Class 1 Ozone Depleting Substances (ODS) are required for this project.
Key Requirements & Clarifications
- Mandatory Site Visit: Attendance at the initial site visit (held February 5, 2026) was required for eligibility to propose.
- Personnel: Key personnel (Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) must meet specific experience requirements. All personnel require AFMC Form 387 badges and escorts for access to the controlled area within Bldg. 9001.
- Quality Control: Contractor is responsible for inspection and documentation per specification section 01 45 00.00 10.
- Environmental: Compliance with Bioenvironmental Regulations, including review of Material Data Sheets for hazardous materials, is mandatory. The Recovered Materials Determination Form indicates consideration for environmentally preferable purchasing.
- Technical: Existing transformers are gas-filled (no PCB testing). Custom busway adapters are intended for new gear. Contractor must install their own hoist system. Demo work will be phased to minimize production impact.
- Documentation: Electronic submission of all documents, including a baseline schedule within 10 days of Notice to Proceed (NTP) and a submittal register within 10 days of NTP. Record drawings, O&M manuals, and DD Form 1354 are also required.
Contract Details & Timeline
- Contract Type: Negotiated (RFP)
- Magnitude: Between $1,000,000 and $5,000,000 (IAW FAR 36.204)
- Performance Period: 10 calendar days to commence work after NTP, 271 calendar days to complete.
- Liquidated Damages: $277.75 per calendar day of delay (minimum $227.75 per day).
- NAICS Code: 236220 (Commercial and Institutional Building Construction) with a $45,000,000.00 annual receipts size standard.
- Bonds: Performance and Payment Bonds are required.
- Wage Determination: Prevailing wage rates for Oklahoma County apply.
Submission & Eligibility
- Proposal Due Date: March 25, 2026, at 4:00 PM CST (extended by Amendment 1).
- Eligibility: Restricted to Tinker AFB MAC BOA holders only.
- Submission: Proposals must be submitted in original and one copy. Offers must be valid for at least 120 calendar days.
- Contacts: Sara Hinds (sara.hinds.2@us.af.mil) and Megan Donaghe (megan.donaghe@us.af.mil).
Evaluation
Evaluation criteria will be detailed in Section M of the solicitation.