Travis AFB MACC BOA

SOL #: FA442725R0016Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4427 60 CONS LGC
TRAVIS AFB, CA, 94535-2632, United States

Place of Performance

LINDA, CA

NAICS

Industrial Building Construction (236210)

PSC

Maintenance Of Other Industrial Buildings (Z1EZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2025
2
Last Updated
Apr 22, 2026
3
Submission Deadline
May 16, 2025, 9:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting applications for a Multiple Award Construction Contract (MACC) Basic Ordering Agreement (BOA) at Travis Air Force Base, CA. This opportunity aims to establish a pool of qualified small business contractors for future construction projects, divided into two pools: Minor Construction (Pool 1) and Major Construction/Design-Build (Pool 2). Applications are accepted until May 15, 2030.

Opportunity Overview

This MACC BOA will serve as the mechanism for awarding future construction task orders at Travis AFB. The government intends to establish a robust vendor base without a pre-established limit on the number of BOAs awarded. There is no guarantee of future work or minimum amount; specific projects will be ordered via competitive proposals. The SF 1442 form included in attachments is for informational purposes only and should not be submitted.

Application Requirements

Contractors must submit a single PDF application using Attachment 4 - Application. Active registration in SAM.gov is mandatory.

  • Pool 1 (Minor Construction): For non-complex projects not requiring design. Requires a cover letter (using Attachment 4 template), three multi-disciplinary construction Past Performance Questionnaires (PPQs) from the last three years, and a letter demonstrating bonding capability.
  • Pool 2 (Major Construction): For complex projects requiring design-build capabilities. Requires the same as Pool 1, plus the SF-330 Architect-Engineer Qualifications form (Attachment 7) with separate Section E for mandatory disciplines: Architectural, Electrical, Mechanical, and Civil Engineering. Environmental engineering is optional.

Evaluation Criteria

Applications will undergo a four-step evaluation process, with all factors considered equally important:

  1. Compliance Review: Verification of active SAM registration, NAICS 236210, and small business status.
  2. Past Performance: Evaluation of three multi-disciplinary construction projects completed on military bases within the last five years, assessing relevancy, recency, and quality.
  3. Bonding Capacity: Proof of maximum aggregate and single bonding capacity via a surety letter.
  4. Architect/Engineering Qualifications: For Pool 2, proof of A/E capabilities via SF-330, covering mandatory disciplines.

Contractors will be assigned to Pool 1 or Pool 2 based on their evaluated capabilities. Bonding will be required for task orders exceeding $150,000.

Anticipated Projects

Recent synopses indicate a wide range of anticipated projects for both pools, including:

  • Pool 1: Window safety film installation, grease trap installation, septic tank replacement, HVAC replacements, ADA door replacements, gas meter replacements, sewer repair, fire station roll-up doors, restroom additions, server room AC replacement, fire tank bypass, condensing/evaporator system replacement, kiddie pool renovation, fire suppression head replacement, roll-up door replacements, water fountain installations, carpet/flooring replacement, interior painting, soundproofing, tripping hazard remediation, sewer/manhole relining, chiller/boiler replacements, and fencing.
  • Pool 2: Road repair/construction, airfield restriping, pavement maintenance, AAFES gas station repairs, fire alarm panel replacement, boiler replacement, hangar door/electrical system design, lift station wastewater pump repair, ALS water pipe/boiler repair, and parking lot reconstruction.

Key Dates & Contacts

People

Points of Contact

Phillip ManwaringPRIMARY
Christina JohnsonSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 25Viewing
Solicitation
Posted: Apr 22, 2026
Version 24
Solicitation
Posted: Apr 21, 2026
View
Version 23
Solicitation
Posted: Apr 21, 2026
View
Version 22
Solicitation
Posted: Mar 17, 2026
View
Version 21
Solicitation
Posted: Mar 17, 2026
View
Version 20
Solicitation
Posted: Mar 10, 2026
View
Version 19
Solicitation
Posted: Feb 19, 2026
View
Version 18
Solicitation
Posted: Feb 18, 2026
View
Version 17
Solicitation
Posted: Feb 5, 2026
View
Version 16
Solicitation
Posted: Jan 28, 2026
View
Version 15
Solicitation
Posted: Jan 22, 2026
View
Version 14
Solicitation
Posted: Jan 7, 2026
View
Version 13
Solicitation
Posted: Dec 31, 2025
View
Version 12
Solicitation
Posted: Dec 31, 2025
View
Version 11
Solicitation
Posted: Dec 16, 2025
View
Version 10
Solicitation
Posted: Sep 23, 2025
View
Version 9
Solicitation
Posted: Sep 23, 2025
View
Version 8
Solicitation
Posted: Aug 11, 2025
View
Version 7
Solicitation
Posted: Jun 5, 2025
View
Version 6
Solicitation
Posted: May 19, 2025
View
Version 5
Solicitation
Posted: Apr 28, 2025
View
Version 4
Solicitation
Posted: Apr 21, 2025
View
Version 3
Solicitation
Posted: Apr 21, 2025
View
Version 2
Solicitation
Posted: Apr 14, 2025
View
Version 1
Solicitation
Posted: Apr 10, 2025
View
Travis AFB MACC BOA | GovScope