USS MIGUEL KEITH (ESB 5) MTA A0004
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP FLT LOG CTR YOKOSUKA, is soliciting proposals for the Mid-Term Availability (MTA) of the USS MIGUEL KEITH (ESB-5). This Firm-Fixed-Price contract, with Time and Material CLINs for growth work, involves extensive repair and maintenance. The work will be performed in Thailand or Singapore. Proposals are due May 8, 2026, at 11:00 AM Singapore Standard Time.
Scope of Work
This opportunity covers a wide range of repair and maintenance tasks as detailed in the Work Item Package (Attachment J-1) and SSU 27-001. Key requirements include management, procurement, production, testing, quality assurance, and technical capability to perform repairs and alterations. The scope encompasses planning, engineering, prefabrication, and shipyard production work, with strict adherence to occupational health standards (29 CFR 1915), control of unclassified information, prevention of oil/hazardous substance discharge, and asbestos removal.
Amendments have clarified various technical requirements and acceptable alternatives for services such as Electrical Shore Power (portable generators acceptable), Potable Water (barge/truck acceptable), and IT Services (mobile phones acceptable). Work Item 0506 (TALT 15-014 Install CMWD System) has been canceled. Clarifications were also provided for numerous other specification items, including requirements for resubmission of documents for certain repairs (e.g., RADOM, Fiddle Board, Forward Mast).
Contract Details
- Contract Type: Firm-Fixed-Price with Time and Material CLINs for growth work.
- Period of Performance: September 26, 2026, to December 10, 2026, with an option for extension until December 26, 2026.
- Place of Performance: Thailand or Singapore.
- Eligibility: Restricted to firms possessing a current Master Ship Repair Agreement (MSRA) or Agreement of Boat Repair (ABR). Offerors must also have an updated registration in the System for Award Management (SAM).
- Liquidated Damages: $61,705.58 per calendar day for delays.
Submission & Evaluation
- Proposal Due Date: May 8, 2026, at 11:00 AM Singapore Standard Time.
- Submission Method: Electronic submission via email to the primary POC, Hipolito Ferrer, or via DoD SAFE for large files.
- Evaluation Criteria: Award will be made to the responsible offeror whose proposal offers the lowest evaluated price and for which non-price factors are rated Acceptable. Evaluation factors include Price, Technical (Understanding the Work Package, Ability to Perform, Management Control & Quality Assurance), and Past Performance.
- Key Deadlines: Requests for Specification Clarification must be submitted no later than 15 calendar days before the offer due date. Proposals must be valid for at least 180 calendar days.
Additional Notes
Solicitation attachments, including specifications and references, will be sent separately via DoDSafe email upon request to the primary contact.