Z1DA--Upgrade Campus Electrical Systems. Project No. 610A4-23-101.

SOL #: 36C25026B0006_1Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
250-NETWORK CONTRACT OFFICE 10 (36C250)
DAYTON, OH, 45428, United States

Place of Performance

Fort Wayne, IN

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 12, 2025
2
Last Updated
Mar 2, 2026
3
Submission Deadline
Feb 12, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is soliciting bids for a Firm-Fixed-Price contract to Upgrade Campus Electrical Systems at the VA Northern Indiana Healthcare System in Fort Wayne, IN. This project, estimated between $10M and $20M, is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Bids are due February 12, 2026, at 10:00 AM EST.

Scope of Work

This project involves a comprehensive electrical service upgrade. Key components include:

  • Demolition of Building 16, including its existing electrical equipment and generators.
  • Construction of a new 6,600 square foot addition to Building 1.
  • Installation of new campus electrical distribution equipment within the addition, specifically three (3) 600 kW standby generators, associated automatic transfer switches (ATSs), and three (3) new unit substations.
  • Removal of an underground fuel storage tank west of Building 16.
  • Integration of new systems with existing infrastructure, including upgrades to interior lighting, fire suppression, plumbing, mechanical, and electrical systems.
  • Installation of an energy monitoring and control system, expansion of the paging system, and new access control, surveillance cameras, and fire alarm systems.
  • Compliance with VA Design Manual, IBC 2021, NFPA codes, OSHA, ASME, IEEE, ANSI, and NEMA standards.

Contract Details & Requirements

  • Contract Type: Firm-Fixed-Price
  • Magnitude: $10,000,000 to $20,000,000
  • Period of Performance: 30 calendar days to commence after Notice to Proceed, with 1,460 calendar days for completion.
  • NAICS Code: 236220 (Commercial and Institutional Building Construction), size standard $45 million.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Bidders must be VA-certified and listed in the SBA database.
  • Bonds: Bid guarantee (20% of bid, max $3M), Performance and Payment Bonds required.
  • Subcontracting: Mandatory VAAR 852.219-75 form requires compliance with subcontracting limitations (e.g., General Construction: no more than 85% to non-certified firms).
  • Wage Rates: Prevailing wage rates for Allen County, IN, as per Attach IX, must be used for labor cost estimation.
  • Technical Specifications: Detailed architectural, structural, HVAC, and electrical calculations are provided in Appendices A, B, C, and D.

Submission & Deadlines

  • Proposal Due: February 12, 2026, at 10:00 AM EST.
  • Submission Method: Email only to the contract specialist.
  • Request for Information (RFI) Deadline: January 20, 2026, 3:00 PM ET.
  • Evaluation: Award will be evaluated without discussions, per FAR 52.214-19.
  • Contact: Brian Rosciszewski, Contract Specialist, Brian.Rosciszewski@va.gov.

Additional Notes

An amendment (0001) corrected the bid due date and provided site visit notes and a sign-in log. Bidders should review these documents for clarifications on site conditions, adjacent projects, and the need to include bid deducts. All utility outages require a two-week notice.

People

Points of Contact

Brian RosciszewskiContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Solicitation
Posted: Mar 2, 2026
View
Version 10
Solicitation
Posted: Feb 27, 2026
View
Version 9
Solicitation
Posted: Feb 24, 2026
View
Version 8
Solicitation
Posted: Feb 20, 2026
View
Version 7
Solicitation
Posted: Feb 12, 2026
View
Version 6
Solicitation
Posted: Feb 12, 2026
View
Version 5
Solicitation
Posted: Feb 9, 2026
View
Version 4
Solicitation
Posted: Feb 5, 2026
View
Version 3
Solicitation
Posted: Feb 2, 2026
View
Version 2Viewing
Solicitation
Posted: Dec 30, 2025
Version 1
Solicitation
Posted: Dec 12, 2025
View
Z1DA--Upgrade Campus Electrical Systems. Project No. 610A4-23-101. | GovScope