Z1DA--Upgrade Campus Electrical Systems. Project No. 610A4-23-101.

SOL #: 36C25026B0006_1Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
250-NETWORK CONTRACT OFFICE 10 (36C250)
DAYTON, OH, 45428, United States

Place of Performance

Fort Wayne, IN

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 12, 2025
2
Last Updated
Mar 2, 2026
3
Submission Deadline
Mar 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the 250-NETWORK CONTRACT OFFICE 10 (36C250), is soliciting bids for the Upgrade Campus Electrical Systems (Project No. 610A4-23-101) at the VA Northern Indiana Healthcare System in Fort Wayne, IN. This project involves a significant electrical infrastructure overhaul. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Bids are due March 5, 2026, at 5:00 PM EST.

Scope of Work

The project entails a comprehensive electrical service upgrade for the campus. Key components include:

  • Demolition: Removal of Building 16, existing electrical equipment, and generators.
  • New Construction: A 6,600 square foot addition to the south side of Building 1 to house new campus electrical distribution equipment.
  • System Installation: Installation of three (3) new 600 kW standby generators, associated 4-pole Automatic Transfer Switches (ATSs), and three (3) new unit substations.
  • Integration: Integration of new electrical systems with existing infrastructure, including retrofitting existing ATS for the Energy Monitoring & Control System (EMCS). Metering cabinets and EMCS are part of the base bid.
  • Ancillary Systems: Upgrades to fire suppression, plumbing, mechanical, electrical, paging, access control, surveillance cameras, and fire alarm systems.
  • Compliance: Adherence to VA Design Manual, applicable codes (IBC 2021, NFPA, OSHA, ASME, IEEE, ANSI, NEMA), and OIT standards. Hazardous abatement (asbestos, lead removal) is required.

Contract Details

  • Contract Type: Firm-Fixed-Price Solicitation.
  • Magnitude of Construction: Estimated between $10,000,000 and $20,000,000.
  • Period of Performance: 1,460 calendar days for completion after notice to proceed.
  • NAICS Code: 236220 (Commercial and Institutional Building Construction) with a size standard of $45 million.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Bidders must be VA-certified SDVOSBs and listed in the SBA certification database at the time of bid submission and prior to award.

Submission & Evaluation

  • Bid Due Date: March 5, 2026, 5:00 PM EST.
  • Bid Opening: Virtual, one hour after the bid submission deadline.
  • Bid Schedule: Bidders must use the "Revised Bid Schedule 2.24.26" (provided with Amendment 0008). Bid Deduct #2 has been reinstated.
  • Evaluation: Award will be evaluated without discussion, per FAR 52.214-19. VAAR Clause 852.236-92 (Additive or Deductive Bid Line Items) outlines the evaluation methodology for bids with additive or deductive items.
  • Mandatory Forms: VAAR 852.219-75 (Limitations on Subcontracting) form is required with the bid.
  • Bonds: A bid guarantee (20% of bid price, not to exceed $3,000,000) is required. Performance and Payment Bonds are required for awards over $30,000 and $150,000 respectively.
  • Wage Determination: The Revised Wage Determination dated 1-30-2026 applies.
  • Technical Clarifications: UL 891 compartmentalized switchboards are NOT permitted. All transfer switches must meet a 4-pole standard, requiring replacement of 13 existing ATS units.

Key Clarifications & Updates

Numerous amendments have been issued, providing critical clarifications:

  • Addendum 1 (Amendment 0008): Updated drawings and specifications, including EPDM roofing thickness and insulated metal wall panels.
  • RFI Responses (Amendments 0003, 0004, 0008): Clarified personnel roles, parking, tax exemption, fire alarm/access control systems, temporary facilities, fuel for generators, excavation/shoring, and specific material specifications. The Building Maintenance System (BMS) is serviced by Havel.
  • Geotechnical Data (Amendment 0002): Provided a final geotechnical report and guidance on helical anchor lengths for bidding (25 feet base, with unit price for additional linear foot).
  • VHA Directive 1192.01: Contractors must comply with the mandatory seasonal influenza vaccination program for Health Care Personnel.

Contact Information

For inquiries, contact Brian Rosciszewski, Contract Specialist, at Brian.Rosciszewski@va.gov.

People

Points of Contact

Brian RosciszewskiContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Solicitation
Posted: Mar 2, 2026
View
Version 10Viewing
Solicitation
Posted: Feb 27, 2026
Version 9
Solicitation
Posted: Feb 24, 2026
View
Version 8
Solicitation
Posted: Feb 20, 2026
View
Version 7
Solicitation
Posted: Feb 12, 2026
View
Version 6
Solicitation
Posted: Feb 12, 2026
View
Version 5
Solicitation
Posted: Feb 9, 2026
View
Version 4
Solicitation
Posted: Feb 5, 2026
View
Version 3
Solicitation
Posted: Feb 2, 2026
View
Version 2
Solicitation
Posted: Dec 30, 2025
View
Version 1
Solicitation
Posted: Dec 12, 2025
View