Army Contracting Command – Red River Army Depot (ACC-RRAD) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)

SOL #: W911RQ-26-S-C001Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC RRAD
TEXARKANA, TX, 75507-5000, United States

Place of Performance

TX

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Oct 9, 2025
2
Last Updated
Apr 13, 2026
3
Action Date
Sep 30, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Contracting Command – Red River Army Depot (ACC-RRAD) has issued a Commercial Solutions Opening (CSO) for Organic Industrial Base (OIB) Modernization. This continuously open solicitation seeks innovative commercial items, technologies, and services to enhance the Army's OIB through advanced manufacturing, digital enterprise, automation, and other critical technologies. The overall CSO remains open until September 30, 2026, with specific Areas of Interest (AoIs) having individual submission deadlines.

Purpose & Scope

The Army aims to modernize its OIB to support acquisition, sustainment, and logistics, focusing on "Convergent Manufacturing" technologies such as Agile/flexible facilities, connected digital enterprise, advanced manufacturing, Digital Twin, automation, and cybersecurity. This CSO utilizes DFARS Subpart 212-70 for a streamlined acquisition process, allowing competitive procurement of innovative commercial solutions from both traditional and non-traditional defense contractors.

Current Areas of Interest (AoIs)

ACC-RRAD is actively seeking solutions for several specific needs:

  • Fixture Removal BFVS Hull (A001): Innovative systems for faster, safer, and higher quality removal of fixtures from Bradley Fighting Vehicle System (BFVS) hulls, maintaining hull integrity. Submission Deadline: November 20, 2025.
  • AS9100 Strategic Partner (A003): A strategic partner to guide ACC-RRAD through AS9100 certification, including gap analysis, QMS implementation, training, and audit preparation. Submission Deadline: November 20, 2025.
  • Power Pack Interface & Test Sets (A005): Design, manufacture, and installation of two Power Pack Interface & Test Sets for Bradley, MLRS, and AMPV, enhancing safety, capabilities, and reducing costs. Submission Deadline: December 31, 2025.
  • Track Pin and Bushing Manufacturing (A004): Innovative solutions for designing, manufacturing, and installing an organic track pin and bushing manufacturing process for military vehicles. Submission Deadline: December 31, 2025.
  • Advanced Manufacturing Acceleration (A007): Commercially viable advanced manufacturing solutions for domestic component manufacturing and OIB-sited scalable production, focusing on critical components and sUAS parts. Submission Deadline: January 29, 2026.
  • Camera Monitoring System (A002): Solutions to replace or refurbish the existing camera monitoring system at the RRAD vehicle test track, which is currently out of service. Submission Deadline: January 31, 2026.
  • Supplemental Labor Management (A008): Innovative solutions for centralized, efficient, and agile management of supplemental labor across multiple depots and arsenals. Submission Deadline: February 25, 2026.
  • Media Blasting Booth (A006): Innovative solutions to upgrade an existing blast booth with an auger and elevator system for improved media reclamation and automated recycling. Submission Deadline: February 26, 2026.
  • DSB ATLAS Crane Lifecycle Support (A009): Commercial solutions for comprehensive lifecycle support (technical support, training, part identification) for the ATLAS Crane system. Submission Deadline: May 01, 2026.

Contract Details

Contracts awarded under this CSO will generally be fixed-price and follow FAR Part 12 Commercial Item Procedures. The period of performance for individual solutions is typically no greater than 12 months, unless specified otherwise in an AoI. Awards are subject to fund availability and successful negotiations.

Submission & Evaluation

The CSO employs a phased evaluation process, which may include a Solution Brief (max 5 pages/15 slides), a Presentation/Pitch, and a detailed Commercial Solution Proposal (CSP). Submissions for specific AoIs must be sent via email to usarmy.rrad.acc.mbx.cso@army.mil with the subject line "INNOVATIVE SOLUTION" (or as specified in the AoI).

Eligibility & Set-Aside

This CSO is open to both traditional and non-traditional defense contractors. There is no specific set-aside for the overall CSO. All selected companies must be registered in the System for Award Management (SAM.gov) prior to award.

Key Dates

  • Overall CSO Closing Date: September 30, 2026
  • Latest AoI Submission Deadline: May 01, 2026 (for ATLAS Crane Lifecycle Support)

Contact Information

For general inquiries, contact the CSO Inbox at usarmy.rrad.acc.mbx.cso@army.mil or Jacob Horn at jacob.j.horn.civ@army.mil.

People

Points of Contact

Files

Files

Download

Versions

Version 15
Special Notice
Posted: Apr 13, 2026
View
Version 14
Special Notice
Posted: Mar 17, 2026
View
Version 13
Special Notice
Posted: Feb 19, 2026
View
Version 12
Special Notice
Posted: Feb 11, 2026
View
Version 11
Special Notice
Posted: Feb 9, 2026
View
Version 10
Special Notice
Posted: Jan 21, 2026
View
Version 9
Special Notice
Posted: Jan 15, 2026
View
Version 8
Special Notice
Posted: Dec 17, 2025
View
Version 7
Special Notice
Posted: Dec 11, 2025
View
Version 6
Special Notice
Posted: Nov 18, 2025
View
Version 5
Special Notice
Posted: Nov 17, 2025
View
Version 4
Special Notice
Posted: Nov 13, 2025
View
Version 3
Special Notice
Posted: Oct 29, 2025
View
Version 2Viewing
Special Notice
Posted: Oct 28, 2025
Version 1
Special Notice
Posted: Oct 9, 2025
View