Building 107 Construction Project at the Charlestown Navy Yard (CNY) in Boston, MA

SOL #: BLDG107Solicitation

Overview

Buyer

General Services Administration
Public Buildings Service
PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH NORTHEAST
Washington, DC, 20405, United States

Place of Performance

Charlestown, MA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 6, 2026
2
Last Updated
Apr 6, 2026
3
Submission Deadline
May 28, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The General Services Administration (GSA), Public Buildings Service, is seeking a contractor for the complete renovation of Building 107 at the Charlestown Navy Yard (CNY) in Boston, MA. This project involves extensive historic preservation and modernization to repurpose the 60,000 SF structure for multi-departmental National Parks Service (NPS) office occupancy. Proposals are due May 28, 2026.

Scope of Work

The project entails a comprehensive renovation of the three-story, 60,000 square foot masonry structure, originally constructed in 1904. Key aspects include:

  • Building Envelope: Work consistent with historic standards, including repointing, roof deck and insulation, slate roofing, skylights, copper gutters and downspouts, and windows.
  • Interior Renovation: Full interior overhaul to repurpose the building for NPS office occupancy.
  • Systems Upgrade: Complete replacement and installation of all Mechanical, Electrical, Plumbing (MEP) & Heating, Ventilation, and Air Conditioning (HVAC) systems.
  • Certification: The project will pursue LEED certification (level TBD).
  • Occupancy: The building will be unoccupied for the entire duration of the renovation.

Key Dates & Events

  • Pre-Proposal Conference: April 14, 2026, at 10:00 AM EST via Google Meet (meet.google.com/yzy-dqiy-rcd).
  • Site Visit: April 16, 2026, at 9:00 AM and 1:00 PM EST, located at BLDG 107, Charlestown Naval Shipyard, Boston, MA.
    • Registration: Required by April 15, 2026, via Google Form (https://forms.gle/2B2CtpjxpXSA2qFb7). Email vanessa.colquitt@gsa.gov if issues arise.
    • Attendance Limit: Maximum two people per company. Subcontractors are considered separate entities.
    • Parking: Not permitted at the Naval Shipyard; use surrounding public facilities.

Contract & Timeline

  • Type: Solicitation (Construction)
  • Product/Service Code: Z2AA - Repair Or Alteration Of Office Buildings
  • Set-Aside: None specified
  • Response Due: May 28, 2026, by 6:00 PM EST
  • Published: April 6, 2026

Place of Performance

Charlestown Navy Yard, Boston, MA 02129, United States.

Contact Information

People

Points of Contact

Vanessa ColquittPRIMARY
Molly LewisSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Solicitation
Posted: Apr 6, 2026
View
Version 1Viewing
Solicitation
Posted: Apr 6, 2026
Building 107 Construction Project at the Charlestown Navy Yard (CNY) in Boston, MA | GovScope