Building 107 Construction Project at the Charlestown Navy Yard (CNY) in Boston, MA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The General Services Administration (GSA), Public Buildings Service, is soliciting proposals for the Building 107 Construction Project at the Charlestown Navy Yard (CNY) in Boston, MA. This Firm-Fixed-Price contract, estimated between $50,000,000 and $60,000,000, involves a comprehensive renovation of the historic 60,000 SF masonry structure. Proposals are due May 28th, 2026, at 2:00 PM EST.
Scope of Work
The project entails the complete renovation of the three-story, 1904-built Building 107 to repurpose it for multi-departmental National Parks Service (NPS) office occupancy. Key requirements include:
- Building envelope work consistent with historic standards (repointing, roof deck and insulation, slate roofing, skylights, copper gutters and downspouts, windows).
- Full interior renovation, including all Mechanical, Electrical, and Plumbing (MEP) & Heating, Ventilation, and Air Conditioning (HVAC) systems.
- The project will pursue LEED certification (level TBD).
- The building will be unoccupied for the duration of the renovation.
Contract Details
- Contract Type: Firm-Fixed-Price
- Estimated Value: $50,000,000 to $60,000,000
- Period of Performance: Substantial Completion required no later than 700 calendar days from Notice to Proceed (NTP), with final Contract Completion within 30 calendar days thereafter.
- Liquidated Damages: $1740 per calendar day for failure to achieve Substantial Completion.
Key Dates & Submission
- Pre-Proposal Conference: April 14th, 2026, 10:00 am (Google Meet).
- Site Visit: April 16th, 2026, at 9:00 am and 1:00 PM EST at BLDG 107, Charlestown Naval Shipyard, Boston, MA. Registration required by April 15th, 2026. Attendance limited to two people per company. Parking is not permitted at the Naval Shipyard.
- Requests for Clarification: Due April 27, 2026, 2:00 PM EST.
- Proposal Due Date: May 28th, 2026, 2:00 PM EST.
- Submission Method: Electronic submission of Technical and Price proposals as separate PDF attachments via email to vanessa.colquitt@gsa.gov. Hard copy submissions will not be accepted.
Evaluation Criteria
Award will be based on a best value determination, where non-price factors are more important than the total evaluated price. Evaluation factors include:
- Project Management Plan/Schedule (30%)
- Company's Experience (30%)
- Company's Past Performance (20%)
- Experience and Qualifications of Key Personnel (20%) Price reasonableness will be evaluated, but no price realism analysis will be performed.
Eligibility & Requirements
- Set-Aside: Full and Open Competition.
- Bid Guarantee: Required, amounting to 20% of the bid price or $3,000,000, whichever is less.
- Performance & Payment Bonds: Required within 10 calendar days after award.
- SAM.gov: Offerors must be registered and "Active" in SAM.gov.
- Subcontracting Plan: Not required with offers, but guidance documents are provided for large businesses.
- Forms: Bidders must complete GSA Form 527 (Contractor's Qualifications and Financial Information) and agree to a Non-Disclosure of Proprietary Information Agreement.
- Wage Rates: Compliance with Massachusetts wage determination (WD MA20260001 Mod 0) is required.
Additional Notes
Several technical documents, including Specifications and Drawings, have been labeled as "CUI" (Controlled Unclassified Information) and are available on SAM.gov. Amendments have provided pre-proposal conference minutes and site visit sign-in sheets.