Building 107 Construction Project at the Charlestown Navy Yard (CNY) in Boston, MA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The General Services Administration (GSA), Public Buildings Service, is soliciting proposals for a Firm-Fixed-Price contract for the Building 107 Construction Project at the Charlestown Navy Yard (CNY) in Boston, MA. This Full and Open Competition opportunity involves the complete renovation of a 60,000 SF historic masonry structure, with an estimated value between $50,000,000 and $60,000,000. Proposals are due May 28, 2026, at 2:00 PM EST.
Scope of Work
The project entails the comprehensive renovation of the three-story, 60,000 SF National Parks Service (NPS) Building 107, originally constructed in 1904. The scope includes:
- Building Envelope Work: Repointing, roof deck and insulation, slate roofing, skylights, copper gutters and downspouts, and window replacement, all consistent with historic standards.
- Full Interior Renovation: Repurposing the building for multi-departmental NPS office occupancy, including updates to all Mechanical, Electrical, and Plumbing (MEP) and Heating, Ventilation, and Air Conditioning (HVAC) systems.
- LEED Certification: The project will pursue LEED certification (level TBD). The building will be unoccupied for the duration of the renovation.
Contract Details
- Contract Type: Firm-Fixed-Price
- Estimated Value: $50,000,000 to $60,000,000
- Period of Performance: Substantial Completion required no later than 700 calendar days from Notice to Proceed (NTP), with Contract Completion within 30 calendar days of Substantial Completion.
- Liquidated Damages: $1,740 per calendar day for failure to achieve Substantial Completion on time.
- Set-Aside: Full and Open Competition. A Small Business Subcontracting Plan is not required with initial offers.
Submission & Evaluation
- Proposal Due Date: May 28, 2026, 2:00 PM EST.
- Submission Method: Electronic submission of separate Technical and Price proposals as PDF attachments via email to vanessa.colquitt@gsa.gov. Hard copy submissions will not be accepted.
- Evaluation Factors: Non-price factors are collectively more important than the Total Evaluated Price.
- Project Management Plan/Schedule (30%)
- Company's Experience (30%)
- Company's Past Performance (20%)
- Experience and Qualifications of Key Personnel (20%)
- Bid Guarantee: Required, amounting to 20% of the bid price or $3,000,000, whichever is less.
- Financial Information: Offerors must complete GSA Form 527, "Contractor's Qualifications and Financial Information."
- Past Performance: Offerors must submit a Past Performance Questionnaire (PPQ) completed by clients.
Key Dates & Actions
- Pre-Proposal Conference: April 14, 2026, 10:00 am (Google Meet: meet.google.com/yzy-dqiy-rcd). Minutes were provided via Amendment 0001.
- Site Visit: April 16, 2026, 9:00 am and 1:00 PM EST at BLDG 107, Charlestown Naval Shipyard, Boston, MA. Registration required by April 15, 2026, via Google Sheet (https://forms.gle/2B2CtpjxpXSA2qFb7). Attendance limited to two people per company; parking is not permitted at the shipyard. A site visit sign-in sheet was provided via Amendment 0002.
- Requests for Clarification/Interpretation Due: April 27, 2026, 2:00 PM EST.
Important Notes
Offerors must be registered and "Active" in SAM.gov. Various technical documents, including Specifications, Drawings, and environmental/geotechnical reports, have been labeled as Controlled Unclassified Information (CUI) and uploaded to SAM.gov, as per Amendment 0003. A Non-Disclosure of Proprietary Information Agreement is required for GSA Consultant access to proposal information. Wage rates for Massachusetts building construction projects (Davis-Bacon Act) are applicable.