FX74 Strategic Airlift Hangar, Naval Station Rota, Spain
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVFACSYSCOM ATLANTIC is soliciting proposals for the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain. This opportunity involves the construction of a new hangar facility, including associated infrastructure and specialized systems. Proposals are due April 9, 2026.
Scope of Work
This solicitation covers the construction of the FX74 Strategic Airlift Hangar. The revised Price Schedule (Attachment B) details the BASE PRICE for the entire work, encompassing the hangar, office/breakroom, fire suppression, fire alarm, telecommunications, drinking fountains, supporting site work, parking lots, site fencing, exterior shade structure, landscaping, site fire protection water supply, site lighting, drain detention system, photovoltaic system, and electric vehicle charging.
Option Items include pricing for contaminated soils removal, unexpected large debris removal, Electronic Security Systems (ESS)/Intrusion Detection System (IDS)/Closed Circuit TV (CCTV), and Audio/Visual (A/V) Systems. A Government Estimated Price is provided for Furniture, Fixtures, and Equipment (FF&E).
Key Requirements & Considerations
- Spanish Registration: Offerors must certify their registration and classification status in accordance with Spanish law (Attachment G). Companies based in Spain or non-EU nations must be registered in the Official Register of Bidders and Contractors of the Spanish Ministry of Finance. Other EU member nations may self-certify.
- Technical Specifications: Specific requirements for Vertical Lift Fabric Doors (UFGS 08 34 16.20) have been clarified, with intentional omissions of certain paragraphs; alternative methods previously allowed under UFGS will not be considered.
- Environmental Protection: The project is subject to a Protected Species Protocol for the Common Chameleon (Attachment K) and a Chameleon Survey Report (Attachment J). Bidders must account for pre-construction surveys, specialized relocation procedures, specific construction practices, and post-construction restoration. A 3rd Party Archaeologist must be included in the proposal.
- Cybersecurity: Specifications for cybersecurity in HVAC, Fire and Life Safety, and Electrical Facility-Related Control Systems (Specs 25 05 11.01, 25 05 11.02, 25 05 11.03) have been updated, including the addition of a "UFC PROCESS CHECKLIST" for fire and life safety systems.
- Pricing: Bidders must use the most recent revised Price Schedule (Attachment B). Failure to submit a complete Price Proposal Form will result in ineligibility.
- Contract Completion: Performance must be completed within 1200 calendar days after notice to proceed.
Contract & Timeline
- Type: Solicitation (Construction Of Other Industrial Buildings - Y1EZ)
- Set-Aside: None specified
- Published Date: March 13, 2026
- Proposal Due: April 9, 2026, at 6:00 PM Z (18:00:00Z)
- Pre-Proposal Inquiries (PPIs): The Government will not respond to PPIs submitted after March 19, 2026.
Amendments & Clarifications
Multiple amendments have been issued, notably:
- Amendment 0001: Clarified PPI response deadlines and specific Vertical Lift Fabric Door requirements.
- Amendment 0002: Extended the proposal deadline to March 12, 2026, clarified contract completion time, and mandated the use of the latest Price Proposal Form.
- Amendment 0003: Further extended the proposal deadline to March 26, 2026.
- Amendment 0004 (most recent): Extended the proposal deadline to April 9, 2026, provided responses to numerous PPIs, and included revised Attachments B, J, and K, along with a continuation sheet detailing extensive specification and drawing updates.
Contact Information
For inquiries, contact Stacy Mitchell at stacy.l.harper-mitchell.civ@us.navy.mil or 757-322-4667.